parallel thread rolling machine,rebar thread rolling machine
Condition:New | Application:process thread on rebars realize rebar splicing | Place of Origin:Beijing China (Mainland) | Brand Name:CRS |
Model Number:CRS32-3 | Voltage:380V | Power(W):3KW, 4KW, 5.5KW | Dimension(L*W*H):1150*670*1000mm |
Weight:400kgs | After-sales Service Provided:Engineers available to service machinery overseas | Hot search:rebar thread rolling machine | Suitable For Rebar Diameter::16-32mm |
Max Thread Length::300mm | Thread Angle::60°/ 75° | Rotated Speed::62r/min | Reduction Ratio::1:23 |
Thread:Parallel Thread | Package:Wooden Cases | Customized:Available | Roller's life:long |
Rebar Thread Rolling Machine with max thread length 300mm
Manufacturing Procedure:
(1) Strip rebar ribs first
(2) Roll parallel thread on rebar end
(3) Splice two pieces of threaded rebar with rebar coupler
Machine Advantages:
Rebar rib peeling straight thread overcomes defects of strapping, welding, extrusion, taper thread, upsetting straight thread, and combines the respective advantages
1) High precision thread
2) High connection strength
3) High construction efficiency
4) Simple operation
5) Saving material
6) Lower cost
7) Shortening construction period
8) Reduce the labor intensity of workers
It is the upgrading technology of steel bar connection in the construction industry.
Main technical parameters:
Model | CRS32-3 |
Rebar Diameter | Φ16-Φ32mm |
Max Thread Length | 70mm |
Thread Angle | 60°/ 75° |
Thread Pitch (mm) | p=2/P=2.5 Φ12-Φ22 |
p=2.5/P=3 Φ25-Φ32 | |
p=3/P=3.5 Φ36-Φ40 | |
Rated power | 3KW, 4KW, 5.5KW |
Rotated Speed | 62r/min |
Dimension L*W*H | 1150*670*1000mm |
After replacing thread rolling head, the machine can process rebar Φ12,Φ14 |
Rebar Thread Rolling Machine Parts
Max thread length, Thread angle, Thread Pitch & Motor Power, all could be customized. Professional in rebar threading.
Any interest, pls feel free to contact us. Sincerely hope a nice talking start soon!
Packaging Detail:Wooden Cases. Goods also could be packed as your requirements |
Delivery Detail:Within 15 days after receiving down payment |