packing system
Processing:Concentrator | Place of Origin:Shandong China (Mainland) | Brand Name:CGET | Processing Types:Alcohol |
Included glass bottle packing, pop can packing, fresh keg packing. Pop can and fresh keg are much simple compared glass bottle packing.
1Glass bottle packing Included: Bottle discharge machine, bottle washing machine, filling machine, sterilize machine, label machine, print machine, box up machine, pipelines and valves and control machine. Inthem, discharge machine contains loading machine and collate machine, accompanied with bottle washing machine.
Bottle washing machine
Included bottle pass in and out equipment, chain, dip and lye dip system. Machine rack, bar bed, liquid pressure equipment, heating system, spray pump system, water cycle, electricity power control system.
Bottle washing process:
Empty bottle in→get→35water dip→dip sterilize for the first time. 70-75, 2-3%NaOH liquid→spray for the first time, 0.2-0.25MPa→dip sterilize for the second time, 60-70, 1-2% NaOH liquid→spray for the second time→low the temperature→out→inspection the bottle.
Filling machine contains transport system, bottle feeding, bottle lifting system, liquid control equipment, and filling valves system.
The quantity of the filling valves determined the packing capacity, the diameter of the turnplate is from 1.45m, the capacity is from 10,000 to 50,000 bottles per hour. Automatic to control the speed, fit for all kinds of breweries.
Lid Capper machine usually contains bottle rotate platform, rotate slideway. Rotate head, height control equipment, hopper and so on. It is usually combined with filling machine, drivered by one same program, working at the same time.
As the capper time is shorter than filling time, so the capper head is less than filling head. The process is: Send→location→press→return.
Sterilize machine contains: transport system, spray system and cycle system.
Through the tunnel type spray sterilize machine, The bottle sent from one side to the other side slowly, After heating, warm keeping, cooling this three process, finished the whole pasteurization.
Included keg washing machine, filling machine, mouth capper machine, transport machine.
Process: pressure keeping 040.40.5MP in bright beer tank→clean keg→prepared CO2→filling and discharge the pressure→mouth capper.
Packaging Detail:all |
Delivery Detail:30 days |