overhead bridge crane

500kg light rail crane, 1span:10m, 2working grade:A3, 3aluminium or steel sinle-girder crane monorail, overhead bridge crane - details see: https://www.machineto.com/overhead-bridge-crane-10196040
Feature:Bridge CraneCondition:NewApplication:handling and exact position goods or assembly warehouseRated Loading Capacity:125kg--1000kg
Max. Lifting Load:1000kgMax. Lifting Height:10mSpan:10mPlace of Origin:Henan China (Mainland)
Brand Name:ANSONModel Number:KBKS 125Certification:CE;ISOWarranty:ONE YEAR
After-sales Service Provided:Engineers available to service machinery overseassteel material:ASTM-A36 OR ASTEM-A709paiting color:red or yellow normally or your requirementworking duty:A3
electric current:380V 50Hz three-phaselifting mechanism:hoist and trolleyvoltage lower protection:includedworking enviroment:heat resisting
technical:modular designstructure shape:according to your requirmentthe advantage:high quality cheaper price 
overhead bridge crane
contact supplier for overhead bridge crane


overhead bridge crane

single girder cranetechnical parameter

capacity(kg)1252505001000
span(mm)7500750060006000

single girder crane feature

1 this monorail can be extended

2 lightweight components
3 stainless steel or aluminium railway available
4 versatile railway design,cross railway and “v”shaped railway
5 Patented components ,such as the curved rail,track switches,turntable end trolley

orders parameter

the weight of load: kg

workshop dimensions

width: mm

length: mm

extending girder length: mm

length of the single girder monorail runway: mm

additional information

accessories introduction

suspensions absorb energy from various directions, thus preventing unnecessary loads being transmitted to the roof or supporting structure.
Track switches allow hoist to switch direction,switching for semi or fully automatic control.
end carriages is firmly connected to the crane trolleys,
they precisely transfer all forces
reliably to the crane or trolley runways.
Shock absorbers integrated in the end caps dissipate the energy transmitted by the loads to all components
flat condoctor line make the power supply system stable and durable, the most important is not easy to damage for it is installed inside the equipment

application

overhead bridge crane
Packaging Detail:standard wooden casedouble girder overhead crane
Delivery Detail:within 20 days after the deposit

Related Product for overhead bridge crane