OTR tyres 16.00-25 shovel tire E3/L3
1.OTR tyres 16.00-25 shovel tire E3/L3, 2.good quality,competitive price,fast delivery, 3.tyres have been passed CCC,ISO,GCC,BV - details see: https://www.machineto.com/otr-tyres-16-00-25-shovel-tire-e3-l3-10117415
Condition:New | Place of Origin:Shandong China (Mainland) | Brand Name:GNT | Model Number:16.00-25,18.00-25,17.5-25,20.5-25,23.5-25,26.5-25 |
Size:16.00-25,18.00-25,17.5-25,20.5-25,23.5-25,26.5-25 | Type:TL/TT | Use:grader,shovel,tipper truck | Material:Nylon |
PR:28/32/36 | Pattern:E3/L3 |
1.Certification: All kinds of certifications such asCCC,ISO, SONCAP,BV,SGSetc.
2. Brands:GNT
3. Term of payment: T/T (30% T/T IN ADVANCE, BALANCE BEFORE THE SHIPMENT)
4. Delivery time: Two weeks after receiving the deposit.
5. Loading Port:Qingdao
6.Package: Wrapping
7.Oringal palce:shandong,china
8.size:OTR tyres 16.00-25 shovel tire E3/L3
Size | PR | Tube | Tread Depth | Standard | Max load | Pressure | Section | Overall Dia | ||
Type | (KG) | (KPa) | Width (mm) | (mm) | ||||||
mm | 50kmph | 10kmph | 50kmph | 10kmph | ||||||
14.00-24 | 24 | TT | 25 | 10.00 | 5150 | 9500 | 575 | 850 | 376 | 1370 |
14.00-25 | 24 | TT | 25 | 10.00 | 5000 | 9500 | 575 | 850 | 381 | 1384 |
16.00-25 | 28 | TL | 30 | 11.25/2.0 | 6700 | 11500 | 575 | 750 | 430 | 1490 |
18.00-25 | 32 | TL | 30 | 13.00/2.5 | 8750 | 15000 | 575 | 750 | 495 | 1615 |
17.5-25 | 16 | TT | 26 | 14.00/1.5 | 4250 | 7300 | 300 | 475 | 445 | 1348 |
20 | TT/TL | 14.00/1.5 | 5000 | 8250 | 400 | 575 | 445 | 1348 | ||
20.5-25 | 16 | TT | 26 | 17.00/2.0 | 5450 | 8250 | 275 | 350 | 521 | 1493 |
20 | TT/TL | 17.00/2.0 | 6000 | 9500 | 325 | 450 | 521 | 1493 | ||
23.5-25 | 20 | TT | 30 | 19.50/2.5 | 6150 | 9500 | 300 | 375 | 597 | 1617 |
24 | TT/TL | 19.50/2.5 | 7300 | 10900 | 350 | 475 | 597 | 1617 | ||
26.5-25 | 28 | TT | 35 | 22.00/3.0 | 10000 | 15500 | 350 | 475 | 673 | 1750 |
32 | TT/TL | 22.00/3.0 | 11200 | 17000 | 425 | 550 | 673 | 1750 |
9.factory picture:
Packaging Detail:Plastic paper or as customer's requirement. |
Delivery Detail:Within 15 days after receiving the deposit. |