NEWEST GENERATION Waste motor oil Engine Oil Refinery
Condition:New | Flow:1000 | Working Pressure:normal pressure | Place of Origin:Henan China (Mainland) |
Brand Name:yilong | Model Number:LL-20 | Usage:Insulation Oil | Voltage:380V |
Power(W):20kw | Dimension(L*W*H):2400mm&10000mm | Weight:42000kg | Certification:CE&BV&TUV&ISO |
After-sales Service Provided:Engineers available to service machinery overseas | fuel:coal ,firewood,natural gas | end product:diesel oil ,petrol,kerosene | power:20kw |
cooling type:water cooling system | raw materials:waste oil/black oil/motor oil | oil yield rate:75% | pollution:no pollution |
function:wase engine oil to diesel oil in car | model:5mt/10mt/15mt/20mt |
Fully continuous and Fully automatic
oil distillation machine brief introduction
( WASTE MOTOR OIL RECYCLING TO DIESEL OIL MACHINEY)
1) What raw material the oil distillation machine can deal with?
NO. | Raw Material | Note |
1 | Waste engine oil | All kinds of liquid oil will be ok, Just the oil yield is different, Please tell us your raw material, our engineer can test the oil yield for you before make order. |
2 | Tyre oil | |
3 | Plastic oil | |
4 | Waste crude oil | |
5 | All kinds of fuel oil | |
6 | All kinds of heavy oil | |
7 | lubricating oil |
2) The model and capacity:
NO. | Model | Handle capacity per batch | weight | power |
1 | LL-5 | 5 MT/D | 25000kg | 22KW |
2 | LL-10 | 10 MT/D | 30000kg | 22KW |
3 | LL-15 | 15 MT/D | 38000kg | 30KW |
3 | LL-20 | 20 MT/D | 42000kg | 30KW |
3) Fuel
NO. | Fuel name | Note |
1 | coal | / |
2 | Firewood | / |
3 | heavy oil | Use oil burner |
4 | fule oil | |
5 | natural gas | Use gas burner |
6 | electricity etc | Electric furnace heating wire |
4) End product percentage ;
for example waste engine oil(water content not more than 5%)
Diesel | kerosene | Gasoline | Waste gas | Heavy oil |
75% | 8% | 7% | 5% | 5% |
5) Containers package :
NO. | Model | Package | Note |
1 | LL-5 | 2*40HQ | 40FR is open container 40HQ is High Cube Container 20 GP is common container |
2 | LL-10 | 2*40HQ+1*20GP | |
3 | LL-15 | 1*40FR + 2*40HQ | |
4 | LL-20 | 1*40FR + 2*40HQ |
6) The machine installation
We will give the foundation drawings to buyer after placing order .we will send engineer in time when buyer get the machine. We are free of installation , debugging machine , train buyer worker to operate the machine .Engineer will not leave until the machine can run normally .
We pay engineer salary for installation. Buyer need book ticket , supply food and accommodation to engineer.
Installation time about 30 days , not more than 35days. It depends workers working efficiency.
7)The machine cover area:
The machine itself covers 1600 square meters(length 40M ; Width 40M)
8)How many workers need operate machine:
One worker is enough for one set machine. Because the machine is fully continuous and fully automatic.
Packaging Detail:two 40 feet high container and one 40 feet flat racks |
Delivery Detail:15days |