new products ZYC360BD-B hydraulic static pile driver from T-works with hydraulic pile breaker

Side piling&corner piling embracing, top-pressing for pile driving Working with precast round/square piles - details see: https://www.machineto.com/new-products-zyc360bd-b-hydraulic-static-pile-driver-from-t-works-with-hydraulic-pile-breaker-10113778
Condition:NewPiling Speed(m/min):7.1Place of Origin:Henan China (Mainland)Brand Name:T-works
Model Number:ZYC 360Weight:360TonDimension(L*W*H):13*7.2*3.05Certification:CE
After-sales Service Provided:Engineers available to service machinery overseascolor:yellowrated piling pressure(KN):3600square pile(mm):500 max
cirle pile(mm):600 maxside piling space(mm):1250cirle piling space(mm):2500power(KW) piling:74
power(KW) lifting:30length:12.5 mwidth:7.2 m 
new products ZYC360BD-B hydraulic static pile driver from T-works with hydraulic pile breaker
contact supplier for new products ZYC360BD-B hydraulic static pile driver from T-works with hydraulic pile breaker


Hydraulic Static Pile Driver-ZYC Series

ZYC360 BD-B

Z----------->Pile Driver

Y----------->Hydraulic

C----------->Renewal modification

B----------->Embracing pile driving

D----------->Top-pressing pile driving

B------------>with side piling

Gracious piling


£ Environmental Friendly

- Low Noise

- Vibration Free

- Minimal Spoils Disposal

£ Able to achieve Good Verticality

£ Lower Risk of machine toppling as compared with conventional leader type machines

£ Every pile is jacked up to between 1.8 times - 2.5 times working load

Method of Jack-in Piling System

A modern technique by which pre-formed piles (e.g. PrestressedSpun Piles, Precast RC Piles, H-Piles,

Steel Pipe Piles) are hydraulically jacked into the ground as displacement piles

Installation Process

Pile is jacked into the ground with a jack-in force adjusted in steps up to between 1.8 times - 2.5 times

working load

Jacking will continue until practical refusal where jack-in force is released and reapplied twice

Downward movement of the pile between the two cycles is then measured and checked against

the “set” criteria

skype: vanessalim614

86 188 7425 1614

new products ZYC360BD-B hydraulic static pile driver from T-works with hydraulic pile breaker
Packaging Detail:main machine nude packed but key parts packed by plastic paper & tape and sealed with grease.
Delivery Detail:20-28 days after the recipt of the deposit

Related Product for new products ZYC360BD-B hydraulic static pile driver from T-works with hydraulic pile breaker