mung beans decorticating machine TFD600
Condition:New | Type:agro machinery | Use:mung beans peeling and milling | Production Capacity:600kgs/hour |
Place of Origin:Liaoning China (Mainland) | Brand Name:Qiaopai | Model Number:TFD600 | Voltage:380v |
Power(W):34.8kws | Dimension(L*W*H):14.5m*2.65m*3.1m | Weight:14mts | Certification:CE&ISO9001:2008 |
Warranty:1 year | Power:34.8kw(380v 3phase 50Hz) or as required | Input capacity:600kgs/hour | % of decorticated beans recovery:70-75% minimum |
% of whole decorticated beans:42% minimum |
1.CE ISO 9001:2008 & TUV certified
2. compact design
3.dried method peeling and patented product
THE DECORTICATING&SEPARATING EQUIPMENT FOR MUNG BEANS TFD600
FUNCTIONS AND FEATURES
The decorticating and separating equipment (TFD600) for mung beans is our company’s patented product with the independent intellectual property, which contains two national patents, and is special-designed equipment for peeling mung beans, most important is that it’s a dry method processing for peeling mung beans instead of traditional complicated wet method. Simplify the processing technology. It can be used to decorticate beans, separate the bran from the decorticated mung beans. The equipment features the following characteristic: higher automatic degree, timing for processing, alarming by sound and light, parking and self-locking, higher percentage of decorticated beans, and better effect for decorticating. It is your optimum equipment for processing mung beans.
COMPONENT
The equipment consists of the input hopper, elevator, top-mounted trolley, grinder (4sets), vibrating screen (2sets), sieve for sorting out bran and separating sieve.
PROCESS
Feeding →elevating →conveying→grinding→vibro-screening→sorting out bran → separating →peeled beans
TECHNICAL PARAMETERS
Power | 34.8kw(380v 3phase 50Hz) or as per required |
Input capacity | 600kgs/hour |
% of peeled beans recovery | 70-75% minimum |
% of whole peeled beans | 42% minimum |
Space occupied | 14.5m*2.65m |
Height | 3.1m |
Weight | 14mts |
Packaging Detail:container |
Delivery Detail:30 working days counting from the date of downpayment arrival |