Multicolour Roof Metal Panel Cold Mill Machine
Place of Origin:Fujian China (Mainland) | Brand Name:Morewinners | Model Number:YX41-390 | After-sales Service Provided:Engineers available to service machinery overseas |
Raw material:Color steel coil | Material tension:G350MPa | Operation:Automatic & Manual | Driving type:Gear & Sprocket |
Forming speed:0-15m/min, Frequency control speed | PLC Control Cabinet:Full English display; Operation is easy | Cutting device:Hydraulic control; Stop to cut | Length of cutting:Automatic control |
Quantity of cutting:Automatic control | Equipment body paint color:RAL 5015 (Blue) or According to the buyer's require |
The description ofColor Steel Tile Cold Mill Machine arefollowing:
1.Main accessories:
Simple decoiler | one set |
Roll forming machine | one set |
Hydraulic cutting device | one set |
PLC control cabinet | one set |
Product rack (No power) | three units |
2.Main technicial data:
Thickness of Raw material | 1.2mm |
Effective width | 390mm |
Feeding width | 600mm |
Material tension | G300MPa |
Forming station | 19 steps |
Main motor | 4KW(2 units); Frequency control speed |
Forming speed | 0-15m/min; Adjustable |
Diameter of shafts | 75mm; 45# steel,fine machining,Quenching and tempering |
Hydraulic power | 3KW |
Material of cutting tool | Cr12 |
Material of forming rollers | 40Cr, fine machining, ourside surface hard chromium plating |
Cutting device | Hydraulic system; PLC computer control |
3.Quality requirment:
1).All of rollers' surface should be painted with hard chrome.
2).The surface of formed sheet should be flat and straight without scratch.
3).The formed sheet should accord with GB/T 12755-2008.
4.Terms of payment:
1), 30% deposit is required by T/T within ten-business days from the contract signing date.
2),70% is required by T/T prior to ship equipment from our factory.
5.Test material
1), It is the responsibility of the client to provide us with sufficient testing panel to china for testing at least 30
days prior to ship equipment from our company.
2), All costs relation to the local transport, customs clearance and local taxes for the sample material will be
paid by the customer.
6.Service after sell:
1). In correct operation & maintaining,the machine is guaranteed for one year since leaving our factory
excluding the electric elements.
2).If necessary,MWIN company will dispatch a technician to the factory abroad to install & regulate the
machine with USD 50/day. The buyer should assist MWIN to get the chinese technician's visa and should
pay for the round trip air ticket and the local accommodation.
7.We can also design and manufacture according to customer's requirement.
Packaging Detail:All parts of machine are naked and loaded into the container |
Delivery Detail:within 50 days since the 30% advance payment received |