Mini Concrete Plastering Pump
Condition:New | Place of Origin:Shandong China (Mainland) | Brand Name:Xinxing | Model Number:PJB-N5 |
Color:Option | Operate:3 people |
N5 Putty
Mortar Spraying Machine
Brief introduction
This is a kind of spraying machine with superior performance and easy to operate.
It'sa type of new machine which is designed based on German advanced products
andconsidering the characteristics of construction and building materials, it's pretty
suitable for construction operation.
This automatic spraying machine requires only 3 people for its operation. One person
conveys the material, another controls the spraying gun, the third one assists them(for
instance: assist to remove the pipe). The whole processes such as water adding,
mixing and delivery of the material etc. are implemented by the machine automatically.
Compared with the manual operation, it can save manpower, material resources,
money and precious time, as well makes the construction quality better and more
reliable than the traditional manual operation.
The whole set of spraying machine is also equipped with safety operation control
system. During the operation, whichever part occurs a fault, the whole machine will
stop working. In this way, it can ensure safety not only of the operator but also the
machine itself. Meantime, it can remind the operator to troubleshoot the machine, save
as much time as possible.
Applicable materials
Heat preservation mortar, dry mortar, crack-resisting mortar, interface agents, epoxy
coating or the similar materials etc.
Technical parameters
Model | N5 completely automatic |
Voltage | 4KW |
Displacement volume | 6-85L/min |
Delivery pressure | 30bar |
Delivery distance | 0-100m |
Delivery height | 30m |
Allowable maximum diameter od material | 3mm |
Hopper volume | 120L |
Feeding mode | Completely automatic |
Weight of control case | 70kg |
Weight of delivery parts | 95kg |
Wight of hopper | 100kg |
Overall weight | 265kg |
Packaging Detail:One 20'GP can hold 5 sets One 40'GP can hold 10 sets |
Delivery Detail:7 days after receipt of the down payment. |