Micro Beer Brewery Equipment 1000L With CE Certificate
1. Free technical training and installation, 2. CE certificate,good service, 3. high quality, best price, 4.Good look - details see: https://www.machineto.com/micro-beer-brewery-equipment-1000l-with-ce-certificate-10021881
Processing:Concentrator | Place of Origin:Shandong China (Mainland) | Brand Name:SD-Breweries | Model Number:SD-1000 |
Processing Types:Carbonated Beverage | Material:sus304 | Thickness:2-3mm | Heated way:Electricity or LPG |
Temperature measurement:Bi-metal themometer | Insulation material:polyurethane | Controling way:automatical or LPG | Bottom cone:60-75 degree cone |
Certification:ISO9001:2000/CE |
This is one of our newest product made from sus 304with a dailyout of 1000L.
it have 2 vessel: Brewkettle/Whirlpool& Mash/Lauter Tun
1. Made from sus 304 from the bottom up to the top of cylindrical component;
2.Mash kettle - mash agitator with variable speed drive, mash pump, valves & stainless plumbing
3. Multi-piece .75 mm. V wire false bottom screens
4. rotating sparge spray arm
5.Spent grain side (or bottom) manway
6. No-foam assembly for attachment to recirculation inlet to reduce aeration
7. rake assembly with variable speed drive and spent grain discharge plow
| |||
Material | SUS 304 | Brewhouse size(1000L) | 1460*2500mm |
Color | Metal Color | Fermenting tank size(2000L) | 1460*3200mm |
Thickness | 2-3mm | Glycol chiller tank size(3000L) | 1800*2000 |
Heated way | Electricity or LPG | Malt mill capacity | 500kg/h |
Temperature measurement | Bi-metal thermometer | Refrigerator | 7P*2 |
Insulation material | polyurethane | Floor Space | 35-50m2 |
Controlling way | automatically or PLC | Payment terms | L/C, T/T |
Bottom | cone | Package | Steel frame and wooden case |
Certification | CE/ISO9001:2000 | Delivery date | 30 days |
MOQ | 1 set | Service | 1-3 years for the entire unit. |
,
Packaging Detail:1.by independent containers or by bulk carriers 2.plastic film, steel frame, wooden case or according to the customers |
Delivery Detail:less than one month after receiving your 40% deposit |