Metal Road Guardrail Pile Driver Machine
Condition:New | Efficiency:High | Piling Speed(m/min):1-2 m/min | Place of Origin:Jiangsu China (Mainland) |
Brand Name:ROADSKY | Model Number:TDB230B Metal Road Guardrail Pile Driver Machine | Weight:2800 kg | Dimension(L*W*H):4290*2000*2620 mm |
Certification:ISO 9001:2000 | After-sales Service Provided:Engineers available to service machinery overseas | Color:Yellow or other colors are available | Rated Power of Diesel Engine:24 HP |
Brand of Diesel Engine:Changchai | Power of Hydraulic Hammer per Stroke:About 800 Joule | Crawler Chassis:It is available if you need | Standard Working Height:Can drive about 3m length steel posts |
Custom-built Service:Can drive about 4m length steel posts if you need | Pile Driving Function:Can drive any kinds of guardrail posts into ground | Pile Extracting Function:Can pull any kinds of guardrail posts out of ground | Guardrail Pile Driver Machine:TDB230B Metal Road Guardrail Pile Driver Machine |
Metal Road Guardrail Pile Driver Machine
1. Functions
1.1 Pile Driving Function: TDB230B Metal Road Guardrail Pile Driver Machine is intended for installing and maintaining the road safety barriers. It is also used for the photovoltaic installation, solar cells and solar panels installation.
1.2 Pile Extracting Function: With the same equipment and hydraulic system for extracting poorly driven or incorrectly positioned posts or road maintenance work, it is a professional machine for extracting the posts out of any conditions of ground.
2. Features
2.1 TDB230B Metal Road Guardrail Pile Driver Machine is composed of chassis, upper column, hydraulic system, hydraulic hammer, diesel engine, electric system, cooling system, control system, post driving and extracting equipment. It has the characters of quick and exact positioning, compact size, lightweight, self-propelled, quick moving, humanized design, easy operation, high efficiency and low price.
2.2 When you use a tow truck or trailer to tow the machine to the working site by the towing device with high speed, first you need to lay down the upper column by hydraulic system, then put the switch of clutch with the traveling roller chain at the right position. The up and down, longitudinal and transverse shift, horizontal slide and rotation of the column are realized through hydraulic system.
2.3 The hydraulic hammer is installed onto the upper column and be downward and upward along the track of the column for pile driving and extracting working by hydraulic system. When extracting guard rail posts, the extractable supporting foot is hydraulically positioned on the ground, for enhanced stability and safe pile extraction.
2.4 It has very famous brand diesel engine Changchai with electrical starting equipped, which has a stable performance, simple operation and maintenance and very long service life.
2.5 The control system is equipped with multiple directional control valve and centralized hydraulic control rods which makes the operation simple and convenient.
2.6 It can install piles up to 3m (9.84’) in length, but on request the machine can be supplied with extension columns which can install piles up to 3.5m (11.48’) or even 4m (13.12’) long.
2.7 The equipment does not need to turn the direction during driving and extracting the guardrail posts on both sides because of its 360° rotating device.
3. Main Technical Specifications
Type | TDB230B |
Rated Power | 24 HP |
Power of battery for electric start | 500 W |
Size (L×W×H) | 4290×2000×2620 mm |
G.W. | 2800 KG |
Weight of Hydraulic Hammer | 300 KG |
Dia. Of Drill Shank | 70 mm |
Hydraulic System Pressure | 16 MPa |
Hydraulic System Flow | 50-55 L/min. |
Displacement | 65 ml/r |
Impulsive Pressure | 10-16 MPa |
Impulsive Frequency | 10-15 Hz |
Rotation Angle | 360° |
Radius of Gyration | 2100 mm |
Extracting Stroke | 1600 mm |
Lateral Stroke | 350 mm |
Lateral Distance | 860 mm |
Supporting Foot Stroke | 400 mm |
Pile Driving Force per Stroke of Hammer | Around 250 KN |
Pile Extracting Force | Around 250 KN |
Working height of hydraulic hammer | ≤3000 mm |
Traveling Speed | 0-15 km/h |
Tow Speed | Around 80 km/h |
Packaging Detail:Metal Road Guardrail Pile Driver Machine: Export and Sea-worthy Standard Special Packing |
Delivery Detail:Pile Driver Machine: 10days after receiving advance payment |