MAX.OD 720mm medium frequency induction heat carbon alloy steel elbow making machine
Condition:New | Place of Origin:Hebei China (Mainland) | Brand Name:fengliyuan | Model Number:according to the need |
Machine Type:Coiling Bending Machine | Raw Material:Pipe | Material / Metal Processed:Carbon Steel | Power:Hydraulic,m-frequency heating |
Automation:Automatic | Extra Services:End Forming | Certification:ISO9001:2008 | After-sales Service Provided:Engineers available to service machinery overseas |
Type:Pipe Bender | Application:Drain Pipe | Pipe Material:Carbon Steel | driving mode:hydraulic |
Working scope | Can Push carbon steel elbow with the max OD.720mm | |||||||
Cost (EXW) | USD | We’d like to assist to handle the export and to deliver the goods to Tianjin Xingang, The buyer pay us for all the chargements. | ||||||
RMB | ||||||||
The Main Technical Parameters of The Machine 1 The oil cylinder: 160mm,the piston:120mm,the effective trip: 4m, pressure:21Mpa,2 bars The maximum thrust of the 2 cylinders: 85 tons; The forward speed: 0—170cm/min , The max backward speed: 800cm/min. 2 The pump station: 63scy-plunger pump :1 set, 18.5KW Motor: 1set (the main working pump) CB-50 gear pump: 1 set, 5.5KW motor: 1set (for fast forward and back) The hydraulic valve is integrated oil rout,hydraulic back fork gate. 3. The frame for the main engine: 18# channel steel, welded with 18kg steel rail 4 The panel for the main engine: welded with 18mm medium plate 5 Distribution cabinets, operation box 1 set 6 Intermediate-frequency power (power 250KW 380v,220v,50Hz) | ||||||||
The scope of supply A. frame for the main engine: 1 piece, hydraulic pump station: 1 set, distribution box 1set, front and back fork door: 1 block each .
| ||||||||
The purchaser should prepare a. power, wire and cable connecting the equipment b. terra screws, cement floor c. water cooling section (pool, water pump, water pipes, etc.) d. hydraulic oil,the mold,the shaping equipment. | ||||||||
After-sales service When the machine arrive your factory, the water, electric prepared well, then we would send our technician to direct to install until the machine works.(accommodation supplied by the buyer and the buyer should offer the installing tools.) We are responsible for the repair in one year after the machine out of our factory, in the first 6 months free for all (except the human factors); in the last 6 months, the buyer would bear the payment of the parts, we repair for free. | ||||||||
Payment terms | 3% advance payment by T/T before the production, 65% by T/T before goods delivery. 5% by T/T after installation and commissioning. |
Packaging Detail:common wooden plate or nothing, wood case for the small parts |
Delivery Detail:according to the specifications and custormer's need |