LZ-500 high carbon steel wire making machine on sale
Condition:New | Inlet Diameter:5.5mm | Outlet Diameter:1.2mm | Place of Origin:Hebei China (Mainland) |
Brand Name:SOKA | Model Number:LZ-500 | Voltage:380V/220V | Power(W):22-30kw |
Dimension(L*W*H):600*2500*1850MM | Weight:22000kg | Certification:ISO9001-2008 | Warranty:One year warranty |
After-sales Service Provided:Engineers available to service machinery overseas | Machine model:LZ-500 | Suitable material:low.medium,high carbon steel wire | Inlet and outlet diameter:5.5mm 1.2mm |
Environment:reduce 20-30% power consumption | Machine quality:Stability,life span more than 20 years | Prouduct name:LZ-500 high carbon steel wire making machine on sale | After sale service:One year warranty,lifetime maintenance |
Certificate:ISO approving,ISO9001-2008 | Website:sokachina.com |
LZ-500 high carbon steel wire making machine on sale
Main features of our product:
carbon straight line wire drawing machine,different quality for different usage
We can promise our quality of the wleding diameter specification 0,8mm; 1.0mm;
1.2mm;1.6mm and so on
Model | LZ400 | LZ500 |
Inletwire Diameter (mm) | 4.2 | 5.5 |
Outletwire Diameter (mm) | 0.8 | 1.2 |
Line Speed (m/s) | 20 | 18 |
Main Motor Power (kw) | 11-15 | 22-30 |
LZ-500 high carbon steel wire making machine on sale
Why let you choose us
1.Production experience:Absorbed ,Professional for 13years
2.Each link strict control the quality
3.Our goals are not do the lowest price to do the best quality
4. Life provides you with technical guidance
5. The long-term supply all kinds of spare parts, make sure that you use perennial
6. To offer our customers workshop design
7. Choose a professional supplier will bring you more convenient
Welcome to visit our factory and we have confident that we shall be your best supplier and partner in the future!
Packaging Detail:Export packing the end of the sleepers fixed machinery to do non-slip, with bubble wrap anti-collision, external plastic packaging waterproof moisture |
Delivery Detail:In 40-50 days after received your advanced payment |