LQ956 Wheel Loader for construction

CE LQ956 Wheel Loader for construction, Fully hydraulic systerm, Bucket can be leveled automatically, High quality,low prices.. - details see: https://www.machineto.com/lq956-wheel-loader-for-construction-10107880
Condition:NewBrand Name:LuqingModel Number:LQ956Place of Origin:Shandong China (Mainland)
Type:Front LoaderMoving Type:Wheel LoaderDimension(Long * Breadth * High):7934*3063*3483mmRated Load:5.0 ton
Certification:CEWarranty:1 yearAfter-sales Service Provided:Engineers available to service machinery overseasColor:yellow
LQ956 Wheel Loader for construction
contact supplier for LQ956 Wheel Loader for construction


CE LQ956 Wheel Loader for construction

Specifications

Rated capacity3m³
Rated weight5000Kg
Operating weight17000Kg
Max. breakout force172.3KN
Total time11.48s
Max. dump height3093mm
Dump distance1198mm
Wheel base3200mm
Thread2250mm
Transportation dimensions7934×3063×3483mm
Engine
Model of engineSTEYR WD12G220E22
PatternTurbocharger, vertical, water-cooled, 4-stroke, direct injection
Rated power162KW
Specified rotational speed2100r/min
Max. torque860N.m
Min. fuel consuming rate126g/kw.h
Total displacement9.726L
Fuel0# or 10# diesel oil
Torque converter and transmission system
Model of torque deviceYJ375X
Pattern3-element,single stage
Transmission typeFull-powershift, countershaft type
Number of gear4 forward,4 reverse
Max. travel speed40km/h
AxleXiuzhou
Main reducer typeArc taper gear, modelration of first grade
Pattern of wheelside moderationSingle stage planetary
Tire
Tire size23.5-25
Steering system
PatternFull hydraulic steering system
Min. turning radius(outside of bucket)7268mm
Max. turning angle35°±1
Implement hydraulic system
Implement pumpCBGJ2080
Displacement250L/min
System working pressure20.3MPa
Distribution device modelDF32
Pilot valve modelDJS
Brake system
Brake systemAir assisted oil disc on four wheel
Parking brakeAir cutting control inner eapand hoof
LQ956 Wheel Loader for construction
Packaging Detail:1 SET IN A 40HQ CONTAINER NUDE CARGO IN CONTAINERS
Delivery Detail:15 DAYS AFTER RECEIVING DOWN PAYMENT

Related Product for LQ956 Wheel Loader for construction