Lost foam casting moulding machinery

OEM service,ISO9001:2008, Good after-sale service, Lost foam and EPC process, Volume&large scale produce, High casting precision - details see: https://www.machineto.com/lost-foam-casting-moulding-machinery-10160717
Condition:NewPlace of Origin:Shandong China (Mainland)Brand Name:SANDRYModel Number:EPC-A
Voltage:380VPower(W):according to the equipmentDimension(L*W*H):non-standardWeight:according to client's demand
Certification:ISO9001:2008Warranty:2 yearAfter-sales Service Provided:Engineers available to service machinery overseastechnology:Lost foam / EPC process
Material recovery:40-70%Advantage1:flexible payment term and punctual deliveryAdvantage2:expored to Iran,Indonesia,TurkeyAdvantage3:OEM & GOOD after-sale service
Lost foam casting moulding machinery
contact supplier for Lost foam casting moulding machinery


Lost foam casting moulding machinery

This process takes advantage of the low boiling point of foam to simplify the investment casting process by removing the need to melt the wax out of the mold.

It has the features of low investment, high efficiency, less labor, stable performance, agile production and extensive applicable scope, hence it is applicable to technical reformation in newly-built casting factory or old casting factory.

Process & Operating principle

1. Mold foam pattern sections.
2. Age pattern to allow dimensional shrinkage.
3. Assemble pattern if it is a multiple piece pattern.
4. Build cluster (multiple patterns per cluster).
5. Coat cluster.
6. Dry coating.
7. Compact cluster in flask.
8. Pour metal.
9. Extract cluster from flask.

MAIN EQUIPMENTS

•Vacuum stablized system:

•Molding system:

•Sand reclamation system

Advantages of Lost foam casting moulding machinery

We sincerely welcome you to visit our factory and loke over our machinery products.If you have any idea or question about our product , pls call me at 86-13361278525

Our factory

Lost foam casting moulding machinery
Packaging Detail:bulk packing OR separated packing
Delivery Detail:30-90 days after 30% deposit

Related Product for Lost foam casting moulding machinery