Load 1ton or 2ton Construction building Hoist
1.It have SC100,SC200,SC100/100,SC200/200 four model., 2.It can load 1000kg(12 person) or 2000kg(19 person), 3.Speed is 33m/min - details see: https://www.machineto.com/load-1ton-or-2ton-construction-building-hoist-10098014
Place of Origin:Chongqing China (Mainland) | Brand Name:Ji Da Pai | Model Number:E series | Rated Loading Capacity(kg):1000kg or 2000kg |
Hoisting Speed:33m/min | Max Lifting Height:300 | Counter-weight:No | Amount of cage:1 or 2 |
Color of cage:Red or Yellow | Operation speed:33m/min | Max installation height:300m | Amount of motor:2 |
Power source:Electric | Operation way:Rack and pinion |
1E series Construction hoist main Technical Parameter
No. | Items | Unit | Model | ||||
SC100 | SC100/100 | SC200 | SC200/200 | ||||
1 | Work way | Transmission by gear and rack | |||||
2 | Counter-Weight | No | |||||
3 | Amount of cage | 1 | 2 | 1 | 2 | ||
4 | Rated load | Kg | 1000 | 2000 | |||
5 | Operation speed | m/min | 33.0 | ||||
6 | Size of Cage External (L×W×H) | m | 3.12×2.192×2.57(have Cab) | ||||
7 | Size of Cage Internal (L×W×H) | m | 3×1.3×2.25(no Cab) | ||||
8 | Size of standard section | m | 0.71×0.71×1.508 | ||||
9 | Safety-brake load | KN | ≥30 | ≥40 | |||
10 | Overload protection device | Have | |||||
11 | Electrical power | KW | 11 | 15 | |||
12 | Cable | 2 | |||||
13 | Amount of motor | 2 | |||||
14 | Distance between two attchment | m | ≤6 | ||||
15 | Weight of cage | Kg | 1600 | 1800 | |||
16 | Weight of standard section | Kg | 170 | ||||
17 | Package | Bare&Band |
2 Vertical support
3 Symmmetric support
Packaging Detail:Nude packing or Iron Boxes in container |
Delivery Detail:Contract take force 30days later ship the first batch |