litharge lead oxide in chemicals

1.7-9 tons / 24 hours, 2.No dust pollution, 3.Free training qualified staff, 4.Provide a full range of production technology - details see: https://www.machineto.com/litharge-lead-oxide-in-chemicals-10300031
Product Type:PbO powerPlace of Origin:China (Mainland)Brand Name:CONCORDModel Number:HD-9
Production:8 MT/24 hoursNumber of Employees:3 people/Production lineInstalled power:100 KW/Production lineMode of production:Continuous production
Heating methods:Electric heating1 MT Pb:Production 1.07 MT PbOEnvironmental conditions:No pollutionEquipment production time:45 day one production line
Training time:30 dayVolume:2*20FCL (one production line)  
litharge lead oxide in chemicals
contact supplier for litharge lead oxide in chemicals


The use of lead oxide

PbO Production Process

Inspection before producing

1. Checking if all transmission is normal

2. Checking if every lubricate position with oil

3. If there has something foreign matter in the pulverizing furnace

Heating

1. Firstly, heating oxidation furnace, when the temperature rise to 300°C,start oxidation transmission, and at the same time start shut fan to prevent overheating deformation. When the temperature rise to 450°Cthan start warming dissolve lead furnace and the temperature debugging to 450°C .

2. When oxidation furnace temperature achieved front furnace 620°Cand 600°Cbehind. (Note: Generally, the temperature often set at front 650°Cand 620 behind .).When dissolve lead furnace temperature reach 500°C,start warming pulverizing furnace.

3. The general heating way for pulverizing furnace is fame heating. When diesel warms up, actuate induced draft fan and open the fold valve on the pulverizing furnace, in case of the fire sucked into pulse, also for pulverizing furnace warming up and thermal insulation. Then start pulverizing transmission motor and begin to heating. Packing the fire dishes in the vent of pulverizing furnace, then ignition and heating.

4. When pulverizing furnace temperature rises around 380°C400°C,then add lead. How many lead should be added is according to the size of pulverizing furnace, generally, 1.2 meters’ furnace add 70 80kilograms. In addition, you can also make decision through seeing the size of pulverizing furnace motor current. After adding lead, stop flame heating and the temperature of the pulverizing furnace begin to decline. After a cooling process, when it dropped to 270°C to280°C, it may has a process of temperature rising, now lead water has in milling exothermic. At the same time, pulverizing motor current gets bigger, at this time, you can adjust fold valves of pulverizing furnace and pipelines well. After adjusting well, pulverizing motor current gets down and the temperature of furnace balances in 270°C 280°C, it proved that oxygen has existed into the cyclone and pulse, and now it is normal, you can also can add lead under normal production, meanwhile actuate all transmission.

Cooling crushing

1. When crush the PbO, the temperature can not be high, otherwise it will produce PbO2.

2. Crushing products with visual to check whether reach mesh. (General for 180 meshes, according to buyer’ request), if not, then should check sieve.

The shut fan should be opened when the temperature of oxidation furnace rises to 360°C.

The role of shut fan: Ensure oxidation furnace not let wind backflow

Can keep the temperature of oxidation furnace constant

It can uniform to add material

PbO Equipments Investment Guide

Ordinary PbO production lineTianlong PbO production line
1place for the pile of raw materialplace for the pile of raw material
2Dissolve lead furnaceDissolve lead furnace
3Pulverizing furnacePulverizing furnace
4Wind controllerWind controller
5Tube for inducing airTube for inducing air
6Semi-finished Material warehouseSemi-finished Material warehouse
7Pulse dust collectingPulse dust collecting
8Cyclone dust collectingCyclone dust collecting
9Oxidation transmissionOxidation transmission
10feeder machinefeeder machine
11Oxidation furnaceOxidation furnace
12Oxidation furnaceOxidation furnace
13centrifugal fancentrifugal fan
14Conveying transmissionConveying transmission
15Percussion devicePercussion device
16Cooling spiral conveyer beltCooling spiral conveyer belt
17Claw type pulverizing systemAirflow screening system
18Cyclone dust collectingCyclone dust collecting

FAQ:

1.Q:Are you a factory or trading company?
A:We are a factory.

2.Q:Where is your factory located? How can I visit there?
A:Our factory is located in Jingjiang City, Jiangsu Province, China, about 2.5 hours bus ride from Shanghai .All our clients, from home or abroad, are warmly welcome to visit us!


3.Q:What is the material of your products?

A: The material is true. We can also choose material as customers’requirement.


4.Q:How can I get some samples?
A: We are honored to offer you samples.

5.Q:How does your factory do regarding quality control?
A:"Quality is priority. Concord people always attach great importance to quality controlling from the very beginning to the very end. Our factory has gained BV, Intertek, SGS authentication.

Welcome to contact us for more details ,most competitive price for you!

litharge lead oxide in chemicals
Packaging Detail:Results fumigation wooden box,2m*2m*2m
Delivery Detail:60 days after recive order

Related Product for litharge lead oxide in chemicals