Less enery consumption gypsum powder production line

Gypsum Powder Production line, 1.Full automatically, 2.Less enery consumption, 3.High efficient - details see: https://www.machineto.com/less-enery-consumption-gypsum-powder-production-line-10087277
Place of Origin:Shandong China (Mainland)Brand Name:YTModel Number:YT-2011COST:LOW
Less enery consumption gypsum powder production line
contact supplier for Less enery consumption gypsum powder production line


Our company could supply long time technical service, good quality equipment, and competitive price.


The parameters of the gypsum powder production line are as follows:

1) Product capacity: 10,000 tons ~ 300,000 tons per year

2) Product quality: In conformity with standard of P.R.C GB/T9776-88 ' gypsum plaster for building purpose'

3) Fuel variety: Coal, fuel oil, natural gas, or liquefied petroleum gas(LPG

gypsum powder production line capacity list :

Capacity/T/

Ton/hour

/

Raw gypsumrock consumption T/year

Heat supplying wayBoiling furnace size
20,0002.724,000

Heat conductive oil or steam

4.5M×1.0M×1.2M
30,0004.236,0004.5M×1.2M×1.4M
50,0006.960,0004.5M×1.4M×1.6M
60,0008.372,0004.5M×1.6M×1.8M
80,00011.1196,0004.5M×1.8M×2.0M
100,00013.88120,0004.5 M×2.0 M×2.2 M
150,00020.83180,0004.5 M×2.2 M×2.4 M
200,00027.77240,0004.5 M×2.4 M×2.6 M
300,00041.66360,0004.5 M×2.6 M×2.8 M

Brief Introduction
Natural gypsum generally includes dehydrate gypsum and anhydrous gypsum. In order to get the valuable materials, generally, we get semi-hydrated gypsum through heating the dehydrate gypsum.

Main Technology
gypsum mine ->first breaking ->second breaking ->grinding ->calcining ->aging ->finished products (CaSO4.1/2H2O)

Raw Materials
Content of CaSO4.2H2O in gypsum mine 80%
The grade of mine and the crystal configuration will influence the quality of semi-hydrated gypsum

The best production line design,quality control strategies,good after service,technical support,technical training.

If you are interested in our production,contact me , i will give you a good price.

Less enery consumption gypsum powder production line
Packaging Detail:wooden boxes,containers
Delivery Detail:90 days after confirmation

Related Product for Less enery consumption gypsum powder production line