Lead oxide mill
Product Type:PbO power | Place of Origin:China (Mainland) | Brand Name:CONCORD | Model Number:HD-9 |
Production:8 MT/24 hours | Number of Employees:3 people/Production line | Installed power:100 KW/Production line | Mode of production:Continuous production |
Heating methods:Electric heating | 1 MT Pb:Production 1.07 MT PbO | Environmental conditions:No pollution | Equipment production time:45 day one production line |
Training time:30 day | Volume:2*20FCL (one production line) |
The use of lead oxide
PbO Production Process
Inspection before producing
1. Checking if all transmission is normal
2. Checking if every lubricate position with oil
3. If there has something foreign matter in the pulverizing furnace
Heating
1. Firstly, heating oxidation furnace, when the temperature rise to 300°C,start oxidation transmission, and at the same time start shut fan to prevent overheating deformation. When the temperature rise to 450°Cthan start warming dissolve lead furnace and the temperature debugging to 450°C .
2. When oxidation furnace temperature achieved front furnace 620°Cand 600°Cbehind. (Note: Generally, the temperature often set at front 650°Cand 620 behind .).When dissolve lead furnace temperature reach 500°C,start warming pulverizing furnace.
3. The general heating way for pulverizing furnace is fame heating. When diesel warms up, actuate induced draft fan and open the fold valve on the pulverizing furnace, in case of the fire sucked into pulse, also for pulverizing furnace warming up and thermal insulation. Then start pulverizing transmission motor and begin to heating. Packing the fire dishes in the vent of pulverizing furnace, then ignition and heating.
4. When pulverizing furnace temperature rises around 380°C400°C,then add lead. How many lead should be added is according to the size of pulverizing furnace, generally, 1.2 meters’ furnace add 70 80kilograms. In addition, you can also make decision through seeing the size of pulverizing furnace motor current. After adding lead, stop flame heating and the temperature of the pulverizing furnace begin to decline. After a cooling process, when it dropped to 270°C to280°C, it may has a process of temperature rising, now lead water has in milling exothermic. At the same time, pulverizing motor current gets bigger, at this time, you can adjust fold valves of pulverizing furnace and pipelines well. After adjusting well, pulverizing motor current gets down and the temperature of furnace balances in 270°C 280°C, it proved that oxygen has existed into the cyclone and pulse, and now it is normal, you can also can add lead under normal production, meanwhile actuate all transmission.
Cooling crushing
1. When crush the PbO, the temperature can not be high, otherwise it will produce PbO2.
2. Crushing products with visual to check whether reach mesh. (General for 180 meshes, according to buyer’ request), if not, then should check sieve.
The shut fan should be opened when the temperature of oxidation furnace rises to 360°C.
The role of shut fan: Ensure oxidation furnace not let wind backflow
Can keep the temperature of oxidation furnace constant
It can uniform to add material
PbO Equipments Investment Guide
Ordinary PbO production line | Tianlong PbO production line | |
1 | place for the pile of raw material | place for the pile of raw material |
2 | Dissolve lead furnace | Dissolve lead furnace |
3 | Pulverizing furnace | Pulverizing furnace |
4 | Wind controller | Wind controller |
5 | Tube for inducing air | Tube for inducing air |
6 | Semi-finished Material warehouse | Semi-finished Material warehouse |
7 | Pulse dust collecting | Pulse dust collecting |
8 | Cyclone dust collecting | Cyclone dust collecting |
9 | Oxidation transmission | Oxidation transmission |
10 | feeder machine | feeder machine |
11 | Oxidation furnace | Oxidation furnace |
12 | Oxidation furnace | Oxidation furnace |
13 | centrifugal fan | centrifugal fan |
14 | Conveying transmission | Conveying transmission |
15 | Percussion device | Percussion device |
16 | Cooling spiral conveyer belt | Cooling spiral conveyer belt |
17 | Claw type pulverizing system | Airflow screening system |
18 | Cyclone dust collecting | Cyclone dust collecting |
FAQ:
1.Q:Are you a factory or trading company?
A:We are a factory.
2.Q:Where is your factory located? How can I visit there?
A:Our factory is located in Jingjiang City, Jiangsu Province, China, about 2.5 hours bus ride from Shanghai .All our clients, from home or abroad, are warmly welcome to visit us!
3.Q:What is the material of your products?
A: The material is true. We can also choose material as customers’requirement.
4.Q:How can I get some samples?
A: We are honored to offer you samples.
5.Q:How does your factory do regarding quality control?
A:"Quality is priority. Concord people always attach great importance to quality controlling from the very beginning to the very end. Our factory has gained BV, Intertek, SGS authentication.
Welcome to contact us for more details ,most competitive price for you!
Packaging Detail:Results fumigation wooden box,2m*2m*2m |
Delivery Detail:60 days after recive order |