LB2000 ASPHALT BATCH STATION at 160t/h Production - TOP QUALITY
Place of Origin:Shandong China (Mainland) | Brand Name:YF | Model Number:LB2000 | Plant:Asphalt Batch Station |
Model:LB2000 | Production:160t/h | Mixer capacity:2000kg | Aggregate weigh:0.5% |
Cement weigh:0.5% | Bitumen weigh:0.3% | Power:480kw | Fuel consumption:<6kg/t |
Supervision:Yes |

Asphalt Batch Station
Parameters
No. | Item | Description |
1 | Model | LB2000 |
2 | Production | 160t/h |
3 | Mixer Capacity | 2000kg |
4 | Aggregate Weighing Accuracy | ±0.5% |
5 | Cement Powder Weighing Accuracy | ±0.5% |
6 | Bitumen (Asphalt) Weighing Accuracy | ±0.3% |
7 | Total Power | 480kw |
8 | Fuel Consumption | <6kg/t |
Options
No. | Model | Production |
A | LB1000 | 80t/h |
B | LB1500 | 120t/h |
C | LB2500 | 200t/h |
D | LB3000 | 240t/h |
E | LB4000 | 320t/h |
Contact Us
Frank Wang
Export Manager
Qingdao Techwell Power Co., Ltd
Skype: dawnshine001
-----------------------------------------------------------------------------------------------------------------------
Qingdao Tehcwell Powerfoucus onCONSTRUCTIONrelated products & main products as follows:
1. Concrete Mixer
2. Construction Machineries
3. Asphalt / Concrete Mixing Plant
Our main market locates inAfrica, South Asia, South Americafor above mentioned products. Clients
from around 20 countries had been established good business relationship with us.
We welcome all friends from worldwide to come to us for a WIN-WIN business.
-----------------------------------------------------------------------------------------------------------------------

Packaging Detail:Seaworthy in Container/ Bulk ship |
Delivery Detail:3~4 weeks after down payment |