Komatsu bulldozer sprocket D31-17 OEM Part No.113-27-31320
1,Bulldozer sprocket, 2,Material:40MnB, 3,Hardness:HCR52-58, 4.Warranty:2000 Hours, 5.Certification:ISO9001,ISO14001 - details see: https://www.machineto.com/komatsu-bulldozer-sprocket-d31-17-oem-part-no-113-27-31320-10078628
Place of Origin:Fujian China (Mainland) | Brand Name:LT | Model Number:D31-17/18 | color:yellow,black |
process:casting | materials:40MnB | treatment:heat treatment | certification:ISO9001,ISO14001 |
machinery:bulldozer | Model:D31-17/18 | Product:sprocket | Warranty:2000 hours |
Hardness:HCR52-58 |
Bulldozer Undercarriage Sprocket D31-17/18
1.Product:Bulldozer Sprocket
2.Brand:Komatsu,Sumitomo,Hyundai,Hitachi,Caterpillar,Kobelco,Daewoo,Mitsubshi,Ihisce,Sunward,Volvo,TGH,Bulldozer and so on.
3.Delivery Time:By the Quantity and the model.
4.Catelogue:
track roller | top roller | sprocket | front idler | track link | |
komaust | |||||
TRACK ROLLER | PC20 | PC30-1 | PC40-5 | PC60-5/6 | PC60-7 |
PC75UU | PC100-5/120 | PC200-5 | PC300-5 | PC400-5 | |
D20 SF | D20 DF | D31 SF | D31 DF | D50 SF | |
D50 DF | D60/65 SF | D60/65 DF | D80/85 SF | D80/85 DF | |
CARRIER ROLLER | PC40-7 | PC60-5/6 | PC60-7 | PC100-5 | PC120-5 |
PC200-5 | PC200-7 | PC300-5 | PC300-7 | D20 | |
D31 | D50 | D65 | D85 | ||
SPROCKET | PC20 | PC30 | PC40-7 | PC60-5 | PC100-5 |
PC200-3 | PC200-5 | PC300-5 | PC300-6/7 | D20 | |
D31-16 | D31-17/18 | ||||
SEGMENT | D50 | D60/65 | D80/85 | ||
IDLER | PC40-7 | PC60-5 | PC100-5 | PC200-5 | PC200-7 |
PC300-5 | D50 | D60/65 | D80/85 | ||
TRACK LINK | PC20 | PC30 | PC40-7/8 | PC50 | PC60-5 |
PC60-6/7 | PC100-5/6 | PC120-6 | PC130 | PC150-3 | |
PC200-3 | PC220-1/2/3 | PC200-5/6/7 | PC300-5 | PC300-6/7 | |
PC350-6 | PC400-1 | PC400-5 | D31 | D50 | |
D60/65 |
Workshop Pictures:
Our company mainly produces all kinds of Track Roller, Carrier Roller, Sprocket and Front Idler, Track Link assembly, and all kinds of excavators and bulldozers undercarriage parts.
Product Pictures:
Certification:
Packaging Detail:by requirement |
Delivery Detail:within 15-45 days after contract established |