KGPS-2Tton Steel shell electric induction smelter for aluminum, iron, copper ,steel,brass
Condition:New | Type:Induction Furnace,induction furnace | Usage:Melting Furnace | Place of Origin:Guangdong China (Mainland) |
Brand Name:Rongdongsheng | Model Number:KGPS--2T | Voltage:380V | Power(W):1250KW |
Certification:CE | material of shell:Aluminum/Steel | Capacity:0.05T~10T | Tilting:Hydrulic |
Rated power:1250Kw | Work frequency:0.5-1KHZ | input voltage:380v | IF Frequency:750V |
Melting time:50-70minutes | Application:melting iron,steel,cooper,brass,aluminum,bronze |
Smelter introduction :
Intermediate frequency furnace is a induction heating equipment , Mainly be used in the material of ferrous and non-ferrous metal casting, melting and heating treatment industry , such as iron, steel, brass, cooper ,bronze zinc ,etc. As well as heating treatment prior to forging , sintering and hot rolling in casting and melting industries.
SmelterCharacteristics :
1.Zerovoltage scanning soft , available for start or stop at any time under any state without impact on power supply;
2.Speedy melting, low production cost , low pollution, conforming to environmental protection requirement;
3.Melting directly from low temperature, available for fully emptying of solution , easy change of category of melting material;
4.Flexibly adjustable power, easy and continuous smooth adjustment, easily controllable temperature, low oxidization loss, uniform metal content;
5.Furnace shell with cast aluminum ally or steel shell construction, small footprint, easy overturn body, available for selection of electric, manual, hydraulic or other overturn mode as needed;
Smelter parameters:
Equipment Type (Furnace capacity) | Power input(Three-phase Four- wire 50/60Hz) | Power Output | Melting Time (Minutes) | Power consumption per ton of material (KW) | |||||||
Rating power (KW) | Input Voltage (V) | Input Current (A) | DC Current (A) | DC Voltage (V) | IF Voltage (V) | IF frequency (KHZ) | Steel (KW) | Iron (KW) | Copper (KW) | ||
KGPS--0.05T | 50 | 380 | 80 | 100 | 500 | 750 | 1-2.5 | 20-60 | 850 | 800 | 450 |
KGPS--0.1T | 100 | 380 | 160 | 200 | 500 | 750 | 1-2.5 | 20-60 | 800 | 750 | 450 |
KGPS--0.2T | 160 | 380 | 256 | 320 | 500 | 750 | 1-2.5 | 30-70 | 750 | 700 | 440 |
KGPS--0.25T | 160 | 380 | 256 | 320 | 500 | 750 | 1-2.5 | 30-70 | 750 | 700 | 440 |
KGPS--0.3T | 200 | 380 | 320 | 400 | 500 | 750 | 1-2.5 | 30-70 | 700 | 650 | 430 |
KGPS--0.5T | 250 | 380 | 400 | 500 | 500 | 750 | 1-2.5 | 30-70 | 650 | 600 | 430 |
KGPS--0.75T | 400 | 380 | 640 | 800 | 500 | 750 | 1-2.5 | 40-70 | 630 | 580 | 400 |
KGPS--1T | 600 | 380 | 960 | 1200 | 500 | 750 | 0.7-1 | 40-70 | 600 | 560 | 390 |
KGPS--1.5T | 1000 | 380 | 1600 | 2000 | 500 | 750 | 0.7-1 | 50-70 | 580 | 530 | 380 |
660 | 912 | 1140 | 880 | 1300 | |||||||
KGPS--2T | 1250 | 380 | 2000 | 2500 | 500 | 750 | 0.5-1 | 50-70 | 560 | 520 | 370 |
660 | 1140 | 1430 | 880 | 1300 | |||||||
KGPS--3T | 1500 | 380 | 2400 | 3000 | 500 | 750 | 0.5-1 | 50-80 | 530 | 510 | 350 |
660 | 1370 | 1710 | 880 | 1300 | |||||||
KGPS--5T | 2500 | 380 | 4000 | 3200 | 780 | 1170 | 0.3-1 | 60-90 | 510 | 490 | 340 |
660 | 2272 | 2840 | 880 | 1300 | |||||||
KGPS--10T | 5000 | 660 | 4560 | 5700 | 880 | 1300 | 0.3-1 | 70-100 | 500 | 450 | 320 |
temperature:1.Steel 1650°C 2.Iron 1450°C 3.Copper 1150 °C 4.Brass 1000 °C 5. Aluminum 700 °C |
Remark:
1.Melting time and power consumption/ton is important to equipment power, raw material shape and weight, operator's skill level and other elements;
2.Configuration :an intermediate frequency power supply,a capacitor cabinet, an overturn control cabinet, body, two sets of reduction boxes and supports, two water cooling cables, etc
3.The above data is of standard model. We also provide customized non-standard products with different power or melting speed.
Our Customer:
Packaging Detail:Standard export packing or according to your request. |
Delivery Detail:About 30 days for the furnace less than 10tons |