Kettle high-shear emulsion machine
Processing:Emulsifier,Emulsifying | Condition:New | Place of Origin:Shanghai China (Mainland) | Brand Name:CHENYO |
Model Number:CY | Processing Types:Fluid | Voltage:380V/50HZ | Power(W):4000-55000w |
Weight:50kg | Certification:CE,ISO | Warranty:12 months | After-sales Service Provided:Engineers available to service machinery overseas |
1.The specific construction of the emulsifier creates big circulation.
1,All materials are mixed and circulated in short time.
3, High speed rotating rotor creates huge suction force which sucks material into center hollow of stator.
4,After shearing, the materials jet out of the stator.
5,The baffle plate’s hight is customized according to material’s viscosity and process requirement.
2 .Application areas
This machine is popular in food, pharmaceutic, cosmetics, petroleum chemical, paper making, water treatment,
and surfactant, lubricant and so on industries.
3.Specification
model | power | capacity | speed |
CYEZ-1.5 | 1.5kW | 100L | 2880rpm |
CYEZ-5.5 | 5.5kW | 250L | 2880rpm |
CYEZ-11 | 11kW | 500L | 2880rpm |
CYEZ-15 | 15kW | 600L | 2880rpm |
CYEZ-18.5 | 18.5kW | 800L | 2880rpm |
CYEZ-22 | 22kW | 1000L | 1440rpm |
CYEZ-30 | 30kW | 1500L | 1440rpm |
CYEZ-37 | 37kW | 2000L | 1440rpm |
CYEY-45 | 45kW | 2500L | 1440rpm |
Remarks:
1. Above mentioned parameters are base on water test. Results to other materials differ depending on their viscosity.
2. If under the working condition of high temperature, high pressure, inflammable explosion environment, the machine should be customized.
4 Advantages
1. Material: wetted parts SS304 or SS316L
2. Optional seals: PTFE, reinforced seal and double-end mechanical seal
3. This type of emulsifier works in atmosphere, vacuum and pressure condition and manage to deal with medium and high viscous material.
4. Materials are sucked from bottom and jetted from top which is good for poor flow material.
For more information or any question, please contact Chenyo Company
Packaging Detail:Export standard packing |
Delivery Detail:30 working days after receiving deposits |