JIN LUN professional Hydraulic plywood hot press machine
Condition:New | Type:Hot Press Machine | Place of Origin:Shandong China (Mainland) | Brand Name:JIN LUN |
Model Number:BY21-4'*8'/40-8 | Voltage:380V | Power(W):11KW | Dimension(L*W*H):3560*1370*4240mm |
Weight:15-30t | Certification:CE ISO9001 | Warranty:3 years | After-sales Service Provided:Engineers available to service machinery overseas |
use:for making plywood |
Model | BY21-4'*8'/40-8 |
Frame style | Combination frame |
Quantity and Diameter of Cylinder | 2 units Φ320mm |
Nominal Pressure | 400Tons |
Quantity of layers | 8 layers |
Stroke of Cylinder | 1050mm |
No-load closing time | About 15s |
Hydraulic system control method | Manually/Automatic controlled |
Hydraulic system pressure | 25MPa |
Main motor | 11KW |
Pressurized motor | 7.5KW |
Main pump | Shanghai Aviation 250 pump |
Pressurized pump | 10ml/rev plunger pump |
Heating platen(working table size) | 2700*1370*42mm |
Heating Meduim in the heating platen | steam or heat transfer oils |
main frame steel plate thickness | 35,22,12mm |
Upper, Bottom crossbeam | 900,800,400mm |
Movable crossbeam | 2700*1370*400mm |
Dimensions of Main frame | 3560*1370*4240mm |
Weight | 32000KG |
Production Capacity | about 30 sheets of plywood in one hour |
1.hydraulic system :
it is "triple filter "and it has excellent oil pump and electric motor
it use right-angle one -way valve so that it can work smoothly
the pressure is adjustable cyclinder
it is worked through excellent CNC precision machine tool.
i t use high quality oil envelop so as to avoid oil leaking
2.control system :
Micro-computer,Manually /Automatic controlled
It can lift the hot platen,close the separation ,add the pressure,keep the pressure
keep time ,descend the hot platen and so on .
3.Heating system
it can be heated by steam/oil /eletrict oil heater .
the steam boiler is low in cost and suitable for common production ,
yet it is high pressure vessels,so it should be operated carefully
As to the oil heater ,it is adjustable ,safe ,uniform temperature,energy
saving
Packaging Detail:export standard packing |
Delivery Detail:30 days after receipt deposit |