Industrial direct gas cooker tilting pot
Condition:New | Place of Origin:Hebei China (Mainland) | Brand Name:SHENS | Model Number:JL-XKLG |
Production Capacity:200-250 kg/time | Certification:ISO9001:2008 | name:industrial direct fired kettle | dimension:1700x1400x1190mm |
pot inner diameter:1100mm | capacity:400L | power:2.2+0.75kw/380v | agitator speed:29r/min |
design temperature:260â | material:stainless steel | working temperature:140-180 â | advantage:energy saving |
Name:
Industrial direct gas cooker tilting pot
Application :
This machine is widely used in cake stuffing (Lotus paste stuffing ,jam),meat products ,condiments such as food mixture heating .
Technical parameter :
Model | JL-XKJG-Q | JL-XKJG-Q | JL-XKJG-Q |
Dimension | 1300*1030*1145mm | 1700*1400*1190mm | 2000*1670*1250mm |
Capacity | 200L | 400L | 600L |
Pot inner diameter | 800mm | 1100mm | 1300mm |
Agitator speed | 23r/min | 23r/min | 23r/min |
Power | 0.75KW/380V | 2.2KW/380V | 4KW/380V |
Design temperature | 260°C | 260°C | 260°C |
Features:
♥Advantage
This product is beneath mixing shovel pot ,solved the probems of tranditional shovel pot waste oil dripping ,discharging and cleaning difficulties ,taking a leading poseition in same domestic industry .
♥Heat source
Take heat transfer oil as energy source ,cyclic oil route heating warming faster ,temperature easy to cotrol ,can ensure food nutrients was not damaged ,all indexes meet the green environmental protection standards.
♥Stirring way
Stirring shaft adopts under drive transmission scraping botom type mixing completely solve problem of high viscisity material viscosity pot ,stir uniformity ,no mixing blind angle ,make the material mixed more fully .
♥Green online
Pot body outside using exterior insulation structure ,control heat volatilizing energy saving .
♥Automatic system
Automatic discharge system, pot body tilt adopts circuit control system, without noise,can tilt to arbitrary angle .
Suitable food:
More products:
Any question contact me freely.
Packaging Detail:wood case box |
Delivery Detail:2-3 weeks after receiving the payment |