Hydraulic Steel Solar Pile Driver for PV Installation

Steel Solar Pile Driver, install guardrails, install about 3m steel post, working efficiency 1-2m/min., crawler chasis is option - details see: https://www.machineto.com/hydraulic-steel-solar-pile-driver-for-pv-installation-10113501
Condition:NewEfficiency:High EfficiencyPiling Speed(m/min):1-2 m/min.Place of Origin:Jiangsu China (Mainland)
Brand Name:ROADSKYModel Number:YZ230A Hydraulic Steel Solar Pile Driver for PV InstallationWeight:2200 kgDimension(L*W*H):2350*2200*3600 mm
Certification:ISO 9001:2000After-sales Service Provided:Engineers available to service machinery overseasColor:Orange red or other colors are availableRated Power of Diesel Engine:24 HP
Brand of Diesel Engine:ChangchaiPower of Hydraulic Hammer per Stroke:About 800 JouleCrawler Chassis:It is available if you needStandard Working Height:Can drive about 3m length steel posts
Custom-built Service:Can drive about 4m length steel posts if you needPile Driving Function:Can drive any kinds of guardrail posts into groundTow Speed:About 60 km/hSteel Solar Pile Driver:Hydraulic Steel Solar Pile Driver for PV Installation
Hydraulic Steel Solar Pile Driver for PV Installation
contact supplier for Hydraulic Steel Solar Pile Driver for PV Installation


Hydraulic Steel Solar Pile Driver for PV Installation

1. Function

1.1 Pile Driving Function: YZ230A Hydraulic Steel Solar Pile Driver for PV Installationis designed to install the highway anti-collision guardrails and guardrail post, especially be applicable for driving road side guardrail post in newly constructing highways. It is also used for the photovoltaic installation, solar cells and solar panels installation.

2. Features

2.1 YZ230A Hydraulic Steel Solar Pile Driver for PV Installationis composed of chassis, upper column, press arm, hydraulic system, hydraulic hammer, diesel engine, electric system, cooling system and control system. It has the characters of quick and exact positioning, compact size, lightweight, self-propelled, quick moving, humanized design, easy operation, high efficiency and low price.

2.2 The upper column is articulated with the main column. When you use a tow truck or trailer to tow the machine to the working site by the towing device with high speed, first you need to lay down the upper column by articulate and disassemble the traveling roller chain. The up and down, longitudinal and transverse shift, horizontal slide of the column are realized through hydraulic system.

2.3 The hydraulic hammer is installed at the front end of the press arm. The press arm carries the hammer downward and upward along the track of the column for post driving working by hydraulic system. You can not use the upward force of the hammer to extract the posts out of the ground directly or it may damage your machine, we suggest you to choose our professional Pile Extractor for extracting the posts out of any kind of ground.

2.4 It has very famous brand diesel engine Changchai with electrical starting equipped, which has a stable performance, simple operation and maintenance and very long service life.

2.5 The control system is equipped with multiple directional control valve and centralized hydraulic control rods which makes the operation simple and convenient.

2.6 It can install piles up to 3m (9.84’) in length, but on request the machine can be supplied with extension columns which can install piles up to 3.5m (11.48’) or even 4m (13.12’) long.

3. Main Technical Specifications

TypeYZ230A
Rated Power24 HP
Size (L×W×H)2350×2200×3600 mm
G.W.2200 KG
Weight of Hydraulic Hammer300 KG
Dia. Of Drill Shank70 mm
Hydraulic System Pressure16 MPa
Hydraulic System Flow50-55 L/min.
Impulsive Pressure10-16 MPa
Impulsive Frequency10-15 Hz
Wheel Track1670 mm
Pile Driving Force per Stroke of HammerAround 250 KN
Working height of hydraulic hammer≤3000 mm
Traveling Speed0-15 km/h
Tow SpeedAround 60 km/h

Hydraulic Steel Solar Pile Driver for PV Installation
Packaging Detail:Hydraulic Steel Solar Pile Driver for PV Installation:Export and sea-worthy standard special packing
Delivery Detail:Solar Pile Driver: 10days after receiving advance payment

Related Product for Hydraulic Steel Solar Pile Driver for PV Installation