Hydraulic Static Pile Driver--ZYC120

A.Unique top-jacking design, B.Original structure design of lifting leg., C.Practical clamping mechanism. - details see: https://www.machineto.com/hydraulic-static-pile-driver-zyc120-10113833
Condition:NewPlace of Origin:Hunan China (Mainland)Brand Name:RealtopModel Number:ZYC120
Hydraulic Static Pile Driver--ZYC120
contact supplier for Hydraulic Static Pile Driver--ZYC120


Characteristics:

1.ZYC series hydraulic static pile driver is a kind of eco-friendly foundation equipment, features with no noise, no vibration, no pollution, high piling efficiency, and excellent quality.

2.The piling driver is composed of clamp, pressuring mechanism, piling driving unit, lifting unit, hoisting unit, hydraulic system, and electrical system and so on. It has the functions of piling hoisting, piling driving, traveling and steering.

3.Clamp and hold one prefabricate concrete pile, H pile or other special steel pile using hydraulic static pressure. Then, press it into the ground base.

4.The machine is convenient to press concrete spun pile, square pile, H pile, and other precast pile at the site of clay, soil and sand.

5.The technology of our clamp mechanism is unique: Clamp the pile with balanced pressure from multipoint directions; completely avoid the unbalanced pressure due to the inflexible design of traditional clamp systems, Suitable for the thin-walled piles.

Specification

Technical Parametes

ZYC120

Rated piling Force(KN)

1200

Max. Piling Speed (m/mim)

3

Min. Piling Speed (m/mim)

0.9

Piling Stroke per time(m)

1.5

Longituding Shift (m)

1.6

Horizontal Shift (m)

0.4

Angle Range(°)

15

Rise& Down Stroke(m)

0.8

Min.Square Pile(mm)

200

Max.Square Pile(mm)

300

Min.Round Pile(mm)

300

Max.Round Pile(mm)

300

Side Piling Space(mm)

450

Corner Piling Space(mm)

1100

Crane Max.Lift Weight(t)

8

Max.Pile Length(m)

12

Piling Power of Electromotor(kw)

22

Crane Power of Electromotor(kw)

11

Dimension (m)

Working Length8
Working Width4.44
Transportation Height2.88

Total Weight (tons)

120

Delivery time

Within 22 working days after receiving the deposit.

Payment term

1 By T/T: 30% deposit and 70% balance before shipping

2 By L/C: 10% deposit by T/T, and 90% payment by irrevocable L/C at sight.

Hydraulic Static Pile Driver--ZYC120
Packaging Detail:nude packing
Delivery Detail:within 40 days after receiving the deposit

Related Product for Hydraulic Static Pile Driver--ZYC120