Hydraulic static pile driver DBYZY240B
Condition:New | Place of Origin:Hunan China (Mainland) | Brand Name:YZY240B | Model Number:DEBOOM |
color:blue |
The hydraulic static pile driver,a new piling machine, is a large model pile machine for foundation construction .The construction of precast pile entirely depends on the pressure of the hydraulic static pile so that the pile can be pressed into the foundation steadily and quietly .This unique construction method with non-pollution has gradually taking place of the pile hammering and vibrating. With the development of science and technology and the enhancement of people's consciousness of environment protection, the hydraulic static pile driver has been applied extensively. Its suitable to be used under the geological condition of collapsible loess, silty clay, sand layer, sedimentary geological stratification, fill foundation and so on, and especially in inner city, so it is eligible to be a kind of ideal eco-friendly foundation equipment. The most remarkable characters of the hydraulic static pile driver are high stability of the technical performance and high reliability of the mature products.
according to the calculation for carrying capacity of precast pile per cubic meter. (The costs is nearly as much as driven cast-in-place pile when the carrying capacity is the same as precast pile.)
Model | Unit | YZY240 | |
Parameter | |||
Rated Piling Pressure | (KN) | 2400 | |
Piling Speed | Fast | ( m/ min) | 5.8 |
Low | 0.76 | ||
Pilling stroke per time | (m ) | 1.8 | |
Shift | Longitudinal | (m ) | 2.8 |
Horizontal | 0.6 | ||
Angle range | ( ° ) | 11 | |
Rise stroke | (m ) | 0.9 | |
Max spun pile | (mm ) | 400 | |
Side piling space | (mm) | 900 | |
Comer piling space | (mm) | 2400 | |
Lift weight | (T) | 8 | |
Lift moment | (tf.m) | 40 | |
Power | piling | (kw) | 60 |
Lift | 30 | ||
Dimension | Working Length | (mm) | 10000 |
Working Width | 6440 | ||
Transportation Height | 2920 | ||
Gross weight | (T) | 255 |
Packaging Detail:nude package,special container |
Delivery Detail:within 30 working days after receving the deposit. |