HSS Timing Pulley Hob Cutter
Place of Origin:Chongqing China (Mainland) | Brand Name:YQ | Material:HSS | Usage:Gear Hob |
Model Number:unknown,MXL XL L H XXH 2M 5M 14M 20M | Coat:TIN/TIALN/TICN |
HSS Timing Pulley Hob Cutter
Specification:
Timing pulley profile | Belt type | Common arrange | Size |
S.T.D | MXL(2.032) | 10-23T 24-R | 32×25×13 |
XL(5.08) | 10-R | 55×50×22 | |
L(9.525) | 10-R | 55×50×22 | |
H(12.7) | 14-19T 20-R | 70×60×27 | |
XH(22.225) | 18-R | 85×85×32 | |
XXH(31.75) | 18-R | 90×90×32 | |
H.T.D | 2M | 50×40×22 | |
3M | 9-15T 16-25T 26-80T 81-R | 50×40×22 | |
5M | 11-16T 17-31T 32-79T 80-200T | 50×50×22 | |
8M | 18-27T 28-40T 41-89T 90-200T | 70×65×27 | |
14M | 28-40T 41-89T 90-R | 75×75×27 | |
20M | |||
S.T.S | 2M | ||
3M | 16-25T 26-80T | 50×40×22 | |
5M | 20-24T 25-40T | 55×60×27 | |
8M | 20-24T 25-31T 32-48T 49-120T | 70×65×27 | |
14M | 28-36T 37-51T 52-100T 101-200T | 75×75×27 | |
20M | |||
A.T.(D.T) | A(T5) | 10-14T 15-20T 21-R | 55×45×22 |
T10 | 12-15T 16-20T 21-R | 65×60×27 | |
T20 | 15-20T 21-R | 80×80×32 | |
(D)T5 | 13-17T 18-25T 26-40T 41-R | 55×45×22 | |
T10 | 12-15T 21-R | 65×60×27 | |
T20 | 15-20T 21-R | 80×80×32 | |
G.T. | 2GT | 16-25T 26-80T | |
3GT | 25-26T 26-50T | ||
5GT | 17-31T 32-79T | ||
8GT | 18-28T 29-89T |
Material Introduction:
A. W6Mo5Cr4V2 (GB) M2( ASTM), S6-5-2(DIN), SKH51(JIS)
chemical composition:C 0.85, Si 0.38, Mn 0.35, P≤0.030, S≤0.030, Cr 4.10, W 6.00, Mo 4.80 V 1.85
main application:It is widely used for making all kinds of cutters and durability cold-work die
B. W6Mo5Cr4V2Co5 (GB), M35( ASTM), 1.3243(DIN), SKH55(JIS)
chemical composition: C 0.93, Si 0.38, Mn 0.35, P≤0.030, S≤0.030, Cr 4.10, W 6.30, Mo 4.80 V 1.85, Co 5.00
main application:It is often used for making blades with high-speed and great cutting difficulty as it’s good abrasive resistance
W6Mo5Cr4V2(M2),W9Mo3Cr4V(W9),W18Cr4V(W18),W6Mo5Cr4V2Al(M2Al),W6Mo5Cr4V2Co5(M35),W2Mo9Cr4VCo8(M42),W4Mo3Cr4VSi(4341),W4Mo2Cr4VSi(4241)
Packaging Detail:oiled paper+carton+wooden case or as requirement |
Delivery Detail:within 25 days |