household mould disgn
Place of Origin:Zhejiang China (Mainland) | Brand Name:Xiong yi | Model Number:XY spice box-001 | Color:all kinds of color |
Sizes:all kinds of sizes | Cavity:1/1 | Design:According to the customers' requirement | Runner:Hot/cold |
Merchine:CNC/EMC/WIRE CUTTING etc. | Plastic Material:PP/PC/PVC/PS etc |
We are Xiong yi specialized in making moldingmore than20years
Gerneral mold specifications:
1.Name: household mould
2.Steel of mould cavity&core :P20/718/2316/3CR13 /40cr/2738/NAK80/S136 etc
3.Steel of mould base :45#,50#,etc
4.Nos of cavity:customized or according to the customers' requirement
5.Hardness of cavity&core:30-33HRC
6.Hardness of wear parts :30-33HRC
7.Core pulling system:motor /oil cylinder/stripping plate,angel,pin etc
8.Mould Accessories:DME/HASCO standard
9:Manufacture Process:Drawing/sample/product data --Agreement comment--Hand made sample--Design comment--Material purchase and Give product instuction--Material inspection and Mould design--Electrode process and Prorm--CNC,wire cut,EDM--Quality inspection--Finish machining cavity,core,jiggle pin--Quality inspectio--Match the moulds--Quality inspection--polishing--Quality innspection--Cautery veins,plate and Nitrification--Quality inspection--Moulds assembly --Quality inspetion --Try mould--Client approbate--Consignation/maufacture
10 Machining center: CNC milling machine -NC wire cutting -NC-EDM and so on
11 Mould life time:500000-1000000 shots,or according to the material of steel
12.Down payment:Usually 30%before we start working
13.R and D:We offer customers the drawings for products and mould structure
14.Confirmation:We send the drawings to cusomer to confirm and the customers give us some suggestions
15.Testing :Testing the mould to make sure everything is ok
16.Lead time:30-45days
17.Imported Steel ensured the long service life of the moulds
18.Rowerful cooling system ensured the product forming speed
19.Advanced computer simulation technology is adoped to analyze mould runner designing
20.Advanced High-precision equipments,High-class R&D team,and strict quality control managment ensured ensured the mould quality
Packaging Detail:Wooden case /plywood case for tool .PE bags add export carton for parts |
Delivery Detail:Delivery the order after 30-45days |