Hot-sell PU Foaming Machine For PU Shoe
Condition:New | Production Capacity:3000 Pairs PU Shoe | Place of Origin:Fujian China (Mainland) | Brand Name:XG |
Model Number:XGP-304/305 | Voltage:380V | Power(W):12.5kw/13.1kw | Dimension(L*W*H):1500*1500*2610 mm |
Weight:1950 kg | Certification:ISO9001:2008 | Warranty:One Year | After-sales Service Provided:Engineers available to service machinery overseas |
Name:PU Foaming Machine | No. of Feed Tank:3 PCS | Volume of Tank:120 L | Total Handing Capacity:40-120 g/s |
Mixing Turning speed of Pouring Mouth:6000/8000 | Produce:PU Shoe, PU Shoe Sole, PU Products... |
Hot-sell PU Foaming Machine For PU Shoe / High Quality PU Shoe Sole Foaming Machine, PU Foaming Machine
Name: XGP-304/305 Polyurethane Shoe Machine
Finished Products:PU Shoe, PU Shoe Sole, PU Prodcuts...
Warranty: One Year
Payment: T/T, L/C at sight etc.
Packing: No package
Delivery Time: 30 Days When Get Deposit.
Port: Xiamen Port
Supply Capacity: 10 Sets/Month
The Feature:
XGP-304/305 Polyurethane pouring machine adopts frequency closed-loop control, intelligent thermoregulation and pressure regulation, with high running and controlling accuracy and reliable and convenient performance. The cast head adopts circular lubrication system, with a unique seal structure and special cooling device, which has a supper sealing property and life that the traditional pouring head can compare with easy the cause with. During production process, it is not east to cause pinhole, bubble and will reduce the cleaning time, save raw materials, production time and costs.
Parameter For XGP-304/305
Main Parameter -- PU Shoe Machine | ||
Model | XGP-304 | XGP-305 |
No. of feed Tank(pcs) | 3 | 3 |
Volume of tank(L) | 120 | 120 |
Total handing capacity (g/s) | 40-120 | 40-120 |
Mixing turning speed of Pouring Mouth (r/min) | 6000/8000 | 6000/8000 |
Total Power (KW) | 12.5 | 13.1 |
Size(L*W*H)(m) | 1.5*1.5*2.61 | 1.5*1.5*2.61 |
Weight (Kg) | 1950 | 1950 |
More Information About the Polyurethane Shoe Machine:
The Data Updated On 9:40 a.m. (GMT +8) July 4th, 2013 By Rhett.
Packaging Detail:NO Package or Custom PU Foaming Machine |
Delivery Detail:30 Days After Get Deposit PU Foaming Machine |