Hot Sale wood powder dryer/wood sawdust dryer 008615238693720
Condition:New | Type:Hot Air Furnace | Place of Origin:Henan China (Mainland) | Brand Name:SL |
Model Number:SLDM series | Voltage:220V | Weight:250 kg | Certification:ISO |
Warranty:one year | After-sales Service Provided:Engineers available to service machinery overseas | Name:Wood powder dryer | Quality:top level |
Operation:so easy | Packing:wooden box | Guarantee:one year | How to purchase:contact with me |
Service:best |
008615238693720
Wood powder dryer
Sawdust dryer
Sawdust drying machine
Sawdust dryer
Sawdust drying machine
008615238693720
Wood powder dryer
008615238693720
Wood powder dryer
Sawdust dryer
Sawdust drying machine
Sawdust dryer
Sawdust dryer
Sawdust drying machine
Automatic feeding, high hot airflow speed, fully mixing of airflow and materials, big drying strength, lower dust and
bigger drying capacity. Moisture in the raw materials of less than 40% can be drying one time to meet the requirement
for coal bar production
Product description
If the material’s moisture is above 12%, the drying machine is needed to dry the moisture from 12% to 6%-8% before the material ( e.g. sawdust ) is put into Briquette machine. The productivity can be designed as the
requirements from customers.
Dryer machine, also called pipeline type drier, adopting twice circulate heating system, is our newly developed
advanced drying equipments, and show the features of automatic feeding, high hot airflow speed, fully mixing
of airflow and materials, big drying strength, lower dust and bigger drying capacity. Moisture in the raw materials
of less than 40% can be drying one time to meet the requirement for coal bar production, which greatly reduced
the labor intensity compared with commonly used dryer machine.
Specifications
Model No. | SLD-1 | SLD-2 |
Productivity (Kg/hour) | 200-300kg | 600-1000kg |
The diameter of the materials | < 3mm& < 5mm | < 3mm& < 5mm |
Motor power | 4kw | 7.5kw |
Product show:
Packaging Detail:Export standard wooden case |
Delivery Detail:5 days after payment |