hot-rolled structure pipe
hot-rolled structure pipe, OD: 3/8"-12", Standard: ASTM A53-B/ A106-B/ API 5L GRB/ API 5CT X42 X45 etc., Price:USD500-USD900 FOB - details see: https://www.machineto.com/hot-rolled-structure-pipe-10079047
Place of Origin:Shandong China (Mainland) | Brand Name:our own factory and brand name | Model Number:20# | GB/T-2008:8162/8163 |
Business type:Manufacturer and Exporter | Brand:Shandong zhongzheng | Price range:USD700/MT-USD900/MT | Delivery time:30 days |
Package:seaworthy standard package | Length:random length or fixed length | Port of loading:Qingdao/Shanghai/Tianjin | Advantage:high quality with low price |
MOQ:20 MT | | | |
hot-rolled structure pipe
Company Name | Shandong Zhongzheng Steelpipe Manufacturing Co.,Ltd |
Business Type | Manufacturer |
Product Description | Seamless Steel Pipe |
Specification |
Chinese Standard | American Standard | German Standard |
10# | A53-A | St37 | DIN1626 |
A106-A | St37-2 | DIN17175 |
A179-C | St35-8 | DIN17175 |
20# | ASTM A106-B | St45-8 | DIN17175 |
ASTM A53-B | St42-2 | DIN1626 |
ASTM 178-C | St45-4 | DIN1629/4 |
45# | ASTM A 1045 | CK45 | |
16Mn | A210-C | St52 | DIN1629 |
OD | 17mm-323mm; 3/8"-12" |
WT | 2mm-40mm; SCH40-XXS |
Packing | Paint on the pipa and with plastic covers at the ends |
Payment | T/T OR L/C |
Delievy Time | 20 days |
Packaging Detail:paint on the pipe and with plastic covers at the ends |
Delivery Detail:30 days |
Related Product for hot-rolled structure pipe