hot chamber die casting Machine to make key chains
Condition:New | Place of Origin:Guangdong China (Mainland) | Brand Name:Zhenli | Model Number:ZL-90T |
Voltage:as per your require | Power(W):11KW | Dimension(L*W*H):4050*1550*1920MM | Weight:4200KG |
Certification:CE-RoHS | Warranty:18 months | After-sales Service Provided:Engineers available to service machinery overseas | Clamping force:900KN |
Die thickness(min-max):140/350MM | Max.shot weight:1.2/1.4KG | Crucible capacity:400KG | machine valves:import from Japan Yuken |
machine electrical parts:import from schneider |
hot chamber die casting machine,Zinc alloy die casting machine ,hot chamber die casting machine,machine model:ZL-90T
advantage:
high shot speed,shorter pressure set up time, import hyrdraulic units and import electrical parts, import valves to ensure the system and performance stable.
As for configuration of our hot-chamber Die casting Machine:
1.Taiwan Mirle control system with LCD monitor(Taiwan).
2. Imported components are used for hydraulic units including YUKen (Janpan), Rexroth(Germany) and Vickers (USA)to ensure the stability of hydraulic system
3. Sealing members are bought from Sealtech of Hong Kong or Veco of France.
4. Posts and columns are purchased from Taiwan General.
5. Electric parts are purchased from FranceSchneider.
2.Nozzle and goose neck are heated by electric heater ,safety and durable.It keep temperature steady and avoid jamming of nozzle resulting defective products .
Central lubrication system automatically,setting up times of toggle turning lubricate directly .
Water-cooling type oil cooler with high cooling efficiency can maintain stable oil temperature.
LOCK CLAMPING UNIT:
1.Moving characteristic of double toggle,high S.G Iron mould platens and CNC precious process.It's firm and durable.
2.Chrome tie-bars with high tensile force,it's reeliable and durable.
3.Protection mould process with low pressure ensures the safety of moulds.
4.Uses high precision elctronic measure checking clamping to control it exactly.
5.Extra large space inside four tie-bars and mould open stoke can contain big moulds and deep cavity moulds.
6.The large clamping capability to realize thickness adjusting automatically
7.Hydraulic lift claping unit can be adjusted for injection at centre or offset positon
8.Computer hydraulic system to realize lock clalmping in 4 parts ,and make sure have protective function in low pressure lock clamping.
INJECTION UNIT
1.Piston type accumulator with a horizontal connection unit ensures lower pressure wastage and fast reaction.It realize fill speed and long life time,using steadily and convenient amendment.
2.Special new idea for two stages injection ,and scale control the slowly injection.It uses digital control speed to fit high quality casting production.
MOULD ADJUSTING DEVICE
1.The two way mould adjusting devices are machine control link and hydraulic control gear .
2.Intelligentized and automatic adjusting program to account clamping position exactly.It's convenient to change tooling and rise the efficiency.
ELECTRONIC CONTROL PARTS
1.Independent electric box and holistic electric box for choosing and ensure easy arrangement from customers .
2.False intelligentized computer control to remember all the act data for convenient operationg and checking .
3.Using high resolution and clear LCD screen which can show Chinese and English,also the display language can convert freely between English and Chinese as to the user requirements .
4.Enlarged memory can store 120 sets mould information ,like time ,counting number ,speed ,pressure,travel stroke,mould thickness and choice conditon .
5.With the function of computer hardware checking itself to ring if it's fault.It's convenient for checking the machines's problem.
6.Imput and output checking function,also with LCD indicator.
7.Uses high precision electronic memasure checking clamping,the position control catually to 0.1mm.
8.Record production time,prodcution quantity and finished quantity automatically,also stop automatically.
STANDARD FEATURES :
1.Two-stage injection adjustment
2.High speed clamping
3.Low pressure clamping device
4.Automatic mould thickness adjustment
5.Computer-controlled lubrication system
6.Hydraulic moving clamping unit
7.Hydraulic multiple ejector
8.Nozzle heater ,gooseneck heater
9.Inclined claping umnit.
10.Fuel-injection furnace
11. Siemens 200 control system with LCD monitor
Packaging Detail:wooden package ,need a 20'GP container |
Delivery Detail:35 days,if have in stock the delivery time will shorter |