HJ-125 6-10mm steel chain making machine
Place of Origin:Zhejiang China (Mainland) | Brand Name:XINJIAN | Model Number:HJ-125 | Primary Voltage:380V 3-phase |
Rated Duty Cycle:20% | Rated Capacity:125KW | Dimensions:2300x1200x2000 | Usage:G80 chain making |
wire size:dia. 6 ~ 10mm | production efficiency:30-50 links/min | motor power:4KW | total weight:appr. 3300kgs |
This welding machine is independently developed by our company by referring to related foreign advanced technologies. The lifting chain of mild alloy steel is welded by method of twiceresistance current flow, and total 19 steps including conveying, turning, welding, heading, and deburring of chain rings are done continuously via cam, electric control and pneumatic control devices. The machine features high automation degree, possible for manual operation, inching, semi-automatic and full automatic operation, stable and reliable actions, convenient maintenance and complete failure protection function. Using PC to control the electrical devices, the machine has ranked at world-level of the same kind in terms of performance indices. The machine is used in welding of hoist circular ring chains, it can also be used for welding of other kinds of circular ring chains such as antiskid chain, decoration chain, binding chain, marine anchor chain, mine chain, etc.
lModel: HJ-125
lSuitable wire diameter: 6-10mm
lChain pitch: 18-50mm
lProductivity: 30-50 rings/min
lRated capacity: 125KVA, 50Hz
lRotary encoder: 600 (round/minute)
lMotor capacity: 4KW, 200-1000 mechanical stepless speed regulation with brake
lPneumatic pressure: ≥0.65MPa
lAir consumption: 8L / cycle
lCooling water consumption: 20L/min.
lMachine dimension: 2300x1200x2000mm (not include control box)
lMachine net weight: 3300KG.
We are a manufacturer of industrial control system for chain making machine. We also agent all kinds of G80, G100 lifting chain/tire chain manufacture machine, includes Bending machine, Welding machine, Heat treatment, Test machine. A hole construction plan of factory can be supplied by our specialists when establish a new one, e.g. where to place cooling tower, how to arrange water pipe and power line. Free training service also is supplied. Hope to establish business relationship with you, and welcome to visit our factory!
Packaging Detail:conforming to standard |
Delivery Detail:2-3 MOTHS ON PAYMENT |