Hight Quality Concrete Mixing Station Specially for High-Speed Railway
1. various of concrete, 2.high efficiency, 3. widely used, 4 computer control, 5.advanced design - details see: https://www.machineto.com/hight-quality-concrete-mixing-station-specially-for-high-speed-railway-10091242
Condition:New | Power Type:Electric | Place of Origin:Fujian China (Mainland) | Brand Name:HengXing |
Model Number:HZS Series | Certification:CE, ISO9001 ISO14001 | Warranty:1year | After-sales Service Provided:Engineers available to service machinery overseas |
HZS Series High Quality Concrete Mixing Station Specially for High-Speed Railway
This concrete mixing station based on the perennial technique of our concrete batching plant and it is developed withSpecial High Quality to meet the demand of high- speed railway technology.
This plant is mainly for mixing high grade concrete of high-speed concrete railway, meanwhile it is Universally applicable for producing common concrete,It is the all-purpose and multi-functional concrete batching equipment.
Technical Parameter
Model | HZS50 | HZS75 | HZS100 | HZS150 | HZS200 | ||
Productivity (m3/h) | 50 | 75 | 100 | 150 | 200 | ||
Host machine of mixer | Model | JS100/ MSO1500 | JS1500/ MSO2250 | JS2000/ MAO3000 | JS3000/ MAO4500 | JS4000/ MAO6000 | |
Mixer power(kw) | 2×22 | 2×30 | 2×37 | 2×55 | 2×75 | ||
Output capacity(m3) | 1 | 1.5 | 2 | 3 | 4 | ||
Aggregate Size (mm) | ≤60 | ≤80 | ≤120 | ≤150 | ≤150 | ||
Batching bunker | Hoppers capacity (m3) | 13 | 15 | 20 | 30 | 30 | |
Hoppers NO. | 4 | 4 | 4 | 4 | 4 | ||
Capacity of Belt conveyor(t/h) | 200 | 300 | 400 | 600 | 800 | ||
Weighting scope and precision | Aggregate(kg) | 4×1500 ±2% | 4×2500±2% | 4×3000±2% | 4×3600±2% | 4×4800±2% | |
(kg) Cement | 600±1% | 900±1% | 1200±1% | 1800±1% | 2400±1% | ||
Coal ash(kg) | 200±1% | 300±1% | 400±1% | 600±1% | 800±1% | ||
Water(kg) | 300±1% | 500±1% | 600±1% | 800±1% | 1000±1% | ||
Additives(kg) | 30±1% | 30±1% | 50±1% | 50±1% | 100±1% | ||
Total power (kw) | 96 | 120 | 140 | 190 | 230 |
Packaging Detail:nude packing of the host equipment;wear parts are packed in wooden cases; or customized;install by our engineers |
Delivery Detail:30-45days after getting the downpayment |