High temperature fberglass filter cloth fiberglass filter bags
Place of Origin:Shandong China (Mainland) | Brand Name:AOBO | Model Number:W-005 | Type:Non-woven Filter |
Usage:Air Filter | Material:Fiberglass,glass fiber | specification:customized | Thickness:1.8-2.4mm |
Weight:800gsm or as your request | Tensile elongation:Warp: <10% Weft: <10% | Working temperature (oC:Continuance: 260 Instant: 300 | Surface treatment:PTFE dip, forming process, calendering |
payment terms:TT ,L/C | Delevery Time:within 15 days after 30% deposit were received | package:according to the requirements |
High temperature fiber flter cloth
Fiberglass filter bags
Description:
1)high temperature resistant filter material
2It has the advantage of lower price,high temperature resistant,but due to high resistance, filtering efficiency is lower.
Name | fiberglass felt / fiberglass filter bag |
material | glass fiber |
Weight | 800gsm or as your request |
Thickness | 1.8-2.4mm |
Tensile strength(N/5 x 20cm) | Warp: ≥1,050 Weft: ≥1,800 |
Tensile elongation | Warp: <10% Weft: <10% |
Permeability (10-3m3/m2S) | 260 - 300 |
Working temperature (oC | Continuance: 260 Instant: 300 |
Surface treatment | PTFE dip, forming process, calendering |
payment terms | TT ,L/C |
Delevery Time | within 15 days after 30% deposit were received |
package | Inter plastic bag,outer woven bag Or packing according to the requirements |
valid time | quotation are valid within 15 days |
:
Features:
Heading Glass fiber filter media, including fiberglass needle felt and woven fiberglass filter cloth,because of it's high temperature resistant, anti-condensation,dimensions stability, dust stripping is good, and high filtration efficiency is widely used in metallurgy, cement, power generation, carbon black, coal-fired boilers, chemical industry and waste incineration industries.
Appication:
Cement plant
Steel iron plant Melting plant
Carbon black plant Electricity Industry
Packaging Detail:Inter plastic bag,outer woven bagOr packing according to the requirements |
Delivery Detail:no more than15 working days after receiving 30% deposit |