High quality Z purlin roll forming machine
Type:Steel Frame & Purlin Machine | Place of Origin:Shanghai China (Mainland) | Brand Name:Allstar | Color:can produce as you like |
size:can produce as you like |
High quality Z purlin roll forming machine
Technical parameter:
1) Max coil width: 640mm
2) Material thickness: 1 .5-3.0mm
3) Main motor power: 18.5kw
4) Dimension: about 8600mm*920mm*1300mm
5) Totalweight: about 8 .6T
Technical specification
1) Decoiler
Manual; un-powered; single head
Max capacity: 5t (hydraulic one is optional)
2) Flattening device: it is used to make the material flattening before feeding into the roll forming machine.
3) Roll forming machine
Shaft diameter: 80mm
Shaft material: high grade 45# steel, heated and quenched treatment HRC60-62
Forming station: 13 main steps, and 7 auxiliary steps
Roller material: GCr15 bearing steel
It can make all the size of profile in the table through changing the position of rollers.
Forming speed: 0 -10m/ min
Voltage: 380V,50HZ, 3 phase
Machine structure of the machine: 36# “ H ” steel
Thickness of frame stand: 16-18mm
Transmission: by chain
4) Hydraulic cutting:
Stop to cut, post cut
Cutter material: Cr12
Cutting length error: 4mm
Hydraulic power: 5 .5kw
5) PLC control system
Using the Mitsubishi PLC control system from Japan control the quantity and length automatically, LCD screen.
Frequency converter to regulate the turning speed
Operation flow: decoiling → feeding guide → flattening → roll forming → punching for horizontal or vertical holes → measure length → cutting → panel to the supporter
Note: Pre-punching or post-punching is determined by detailed place of hole.
Business Conditions
Price: USD30500 FOB Shanghai (with manual decoiler); USD40000 FOB Shanghai (with hydraulic decoiler).
Payment Term: 35 % T/T in advance, 65% T /T at the sight of B/L Copy.
Delivery Time: Within 65 Work Days after receipt of the down payment.
Warranty: 12 months since the date of B/L.
Installation and Commissioning: 1 or 2 professional engineers will be sent for installation and commissioning, and the buyer should pay 100 USD/day for each one, besides, the accommodation and the round-trip ticket are also on the buyer’s side.
Packaging Detail:bare package |
Delivery Detail:65days |