High Quality Yellow Ground Three Cylinder Dryer Drying Machine
Type:Hot Air Furnace | Place of Origin:Henan China (Mainland) | Brand Name:Yonghua | Model Number:LH-2.5*6m |
Color:As customer's request | Guarantee:one year guarantee |
High Quality Yellow Ground Three Cylinder Dryer Drying Machine
Quick Details
Place of Origin:Henan China (Mainland) | Brand Name:Yonghua | Model Number:LH |
Type:Spray Drying Equipment | color:As your request | warranty:one year |
Packaging Detail: | Standard container |
Delivery Detail: | 20 days after receiving your dowmpayment |
High efficiency 3-cylinder dryer
The materials can keep enough stay time and sufficient dispersion in cylinders.
Introduction
3—cylinder dryer is composed of three concentric cylinders of different diameters in accordance with certain mathematical ralationship and structural form, embedded in each phase.
Main principle
According to thermal power principle, the lifting blade and guiding plate of different angles and spacing are provided in the cylinders, this structure can guarantee that dried materials move under the gravity action and along the direction of spiral movement.
High Quality Yellow Ground Three Cylinder Dryer Drying Machine
Advantages
The materials can keep enough stay time and sufficient dispersion in cylinders, which makes full heat exchange between the materials in cylinders and the hot air from the combustion chamber, eliminating the defects shch that conventional drying equipment often has wind tunnel on its section to make heat exchange area small and unit volume evaporation intensity low.
Main Technical Parameter
Model(m) | Outer tube diameter(m) | Length of outer tube(m) | Cylinder speed(r/min) | Capacity(t/h) | Moter power(kw) | Reducer model |
LHΦ2.0×4.5 | 2.0 | 4.5 | 4-10 | 13-17 10-15 | 5.5×2 | XWD-5.5KW-8 |
LHΦ2.5×6 | 2.5 | 6 | 4-10 | 21-28 18-25 | 5.5×4 | XWD-5.5KW-5 |
LHΦ3.2×7 | 3.2 | 7 | 4-10 | 45-47.5 40-45 | 7.5×4 | XWD-7.5KW-8 |
Contract: Anne Zhang
Tel: 0086- 13598443935
....
Packaging Detail:Standard Container or packing |
Delivery Detail:25 days after receiving downpayment |