High quality carrier tape molding machine
Condition:New | Automatic Grade:Automatic | Place of Origin:Guangdong China (Mainland) | Brand Name:JDL |
Model Number:CF-10 | Certification:ISO9001, SGS | Warranty:1 year | After-sales Service Provided:No overseas service provided |
Speed:be up to 380m/h | Operate mode:Flat blow molding, man-machine interface, easy and intuitive | carrier tape width:12-88mm | tape length:up to 120mm |
Detection:Fault detection alarm system | Use:the taping production a variety of surface mounting devices (SMD) | Power:1200W | Type:Packing Machine |
Driven Type:Electric | Packaging Material:SMD |
JDL high speed carrier tape molding automatic machine
Model: CF-10
Use: the taping production a variety of surface mounting devices (SMD)
Capability and parameter:
·Flat blow molding, man-machine interface, easy and intuitive; automatic fault detection alarm system guarantees the normal operation of the equipments pneumatic components and servo motor lead screw are used;the performance is superior and stable; the secondary auxiliary molding depth can be up to 30MM (to be customized upon in excess of 30MM), parallel bars are used for the mold frame to locate, and X/Y axis is fine-tuned with micrometer, saving time to adjust the mold; automatically cut after setting the production quantity, to save labor and raw materials to the maximum extent. A carrier tape quality detector is loaded optionally.
Production process:
·Automatically detect the emptying-warm-up-heat-mold-push (E value protection)-punch-tape-automatically detects the materials received-automatically cut after reaching the set value.
Scope of set parameters:
·The heating time; blow molding time; auxiliary molding time;
·Tape speed; tape length; length in production
·The production of the applicable 12mm to 88mm carrier tapes
·Tape length is up to 120MM;
·The highest theoretical speed in production can be up to 450m/h(the speed of commissioning shield carrier tapes of our company reaches 380m/h).
Packaging Detail:wooden box |
Delivery Detail:within 120 days after confirm prepayment |