High Frequency Steel Pipe making machine
Condition:New | Type:Pipe Production Line | Pipe Material:Carbon Steel | Application:Energy Supply Pipe |
Place of Origin:Zhejiang China (Mainland) | Brand Name:RELIANCE | Model Number:RE-20-165 | Warranty:12 months |
ERW Pipe:Carbon Steel | High Frequency Welding:High Speed | ERW steel pipe for the construction,:oil and gas industries. | High Capacity:High Tolerance |
High Tolerance:On Time Delivery |
High Frequency Steel Pipe making machine
used in agriculture, industry and construction activities like scaffolding and casing in bore wells. It is a continuous complete line to product pipe for oil and natural gas transmission, large-diameter API grade line pipe, and medium-diameter ERW pipe for the construction, oil and gas industries.
Grades
ERWPipe making machine Specification
25 | 32 | 50 | 76 | |
Outside diameter(mm) | Φ8-Φ32 | Φ13-Φ38 | Φ15-Φ60 | Φ15-Φ76 |
Thickness(mm) | 0.3-1.4 | 0.4-2.0 | 0.6-3.0 | 0.5-4.0 |
Tube welding speed(M/min) | 20-70 | 20-70 | 15-60 | 10-50 |
Main driver(Kw) | 22 | 30 | 75 | 90 |
114 | 168 | 219 | 114FF | |
Outside diameter(mm) | Φ40-Φ114 | Φ60-Φ168 | Φ76-Φ219 | Φ42-Φ114 |
Thickness(mm) | 1.0-6.0 | 2.0-6.0 | 2.0-6.0 | 3.5-10.0 |
Tube welding speed(M/min) | 15-60 | 15-60 | 15-60 | 15-35 |
Main driver(Kw) | 132*2 | 132*2 | 160*2 | 500 |
Equipment List
1. Double side uncoiler
2. Hoop cage or Horizontal Accumulator
3. Main Machine:
3.1. Forming Machine
3.2 Roller System of Forming
3.3 Seam Guide
3.4 High Frequency Induction Welding Machine
3.5 Roller System for Moving
3.6 Burr Removing Frame(inside and outside burr)
3.7 Water Cooling System
3.8 Sizing Machine
3.9 Roller System of Leveling
3.10 Speed Testing Wheel
3.11 Turk Head
4. Flying Saw Controlled by Computer
5. Run Out Table
6. Electric Controlled Equipment
7. High Frequency Welder
ERW Welded Pipe Line Work Flow
Packaging Detail:Machine is fixed in the container with steel ropes so that the machine is kept from being collided, and treatment for rust-proof, covered by plastic film for the whole machine, spare parts and some small parts packed in wooden box. |
Delivery Detail:3-4 Months |