High efficient LHS0.5 vertical gaz fired steam boiler for greenhouse
LHS0.5 vertical gaz fired steam boiler, 1.PLC control, 2.High efficiency: 90%, 3.Vertical stainless steel pump, 4.Fuel gas - details see: https://www.machineto.com/high-efficient-lhs0-5-vertical-gaz-fired-steam-boiler-for-greenhouse-10211895
Condition:New | Type:Natural Circulation | Usage:Industrial | Structure:Fire Tube |
Pressure:Low Pressure,0.4mpa 0.7mpa 1.0mpa, adjustable | Style:Vertical | Fuel:gaz fired,Gas fired steam boiler | Place of Origin:Henan China (Mainland) |
Brand Name:Bidragon (gas fired steam boiler) | Model Number:LHS0.5-0.7-Q gaz boiler | Output:Steam | Dimension(L*W*H):1420*1300*2670 |
Weight:1.65t | Certification:ISO9001, CE, ASME | After-sales Service Provided:Engineers available to service machinery overseas | Efficiency:90% |
natural gas consumption:37.5 nm3/h | Burner brand:Italy brand Riello | Feed water pump:Vertical stainless steel pump | water softner:American Brand Head |
Application:House, Hotel, Industry, Greenhouse | Burner:Top burner | Skype:bidragon2019 |
1. Product Name
High efficient LHS0.5 vertical gaz fired steam boiler for greenhouse
2. Application scope
- Industrial users: the pharmaceutical, paper making, tobacco, printing and dyeing, garment and other industries.
- Civil: catering, laundry room, (hospital) disinfection, sauna, etc.
- Heated by heat exchanger heating system soda<air conditioning, radiators, floor heating, etc.) hot water.
3. Advantage of Heavy oil and natural gas dual fuel fired steam boiler
- Advanced three pass wet back design:adopts the most sophisticated three returns all wet back structure,thread smoke tube structure, weld joint with high quality.
- Advanced manufacturing equipment endows Safe and reliable property:adopts corrugated furnace lamps, multi-chain protection. Water level, steam pressure, gas pressure protection. And before leaving factory, all the boiler have been rigorous inspection and testing, including pressure tests and X-ray detection.
- Large boiler proper heatingarea:adopts unique design of a large combustion chamber which increases the radiation heating furnace area, reducing the size of the boiler, reducing the NOX emissions.
- High efficiency98%:with threaded pipe and high effective insulation materials and econoizer, increasing the heat transfer and improve boiler thermal efficiency.
- PLC intelligent controller:boiler control system suitable for high temperature, high humidity environment of long-term operation.
- High standard:strictly in accordance with Chinese national norms and standards of production, all boiler pressure parts are of high quality steel.
- High quality accessories:all accessories such as burners, pumps, water level controller, valves and other supporting instruments of international or domestic famous brands.
- Simple maintenance:the manhole and hand hole is easy for user to maintain.
- Meet customer’s customized requirement:different designs are available according to customers' specific requirement.
4. Technical Parameter
Type | Vertical Steam Boiler | ||||
Model | LHS0.1- 0.4[0.7]-Y/Q | LHS0.2- 0.4[0.7]-Y/Q | LHS0.35- 0.4[0.7]-Y/Q | LHS0.5- 0.4[0.7]-Y/Q | |
Rated Evaporation | t/h | 0.1 | 0.2 | 0.35 | 0.5 |
Rated Steam Pressure | Mpa | 0.4/0.7 | |||
Rated Steam Temperature | °C | 152/171 | |||
Thermal Efficiency | % | 90% | |||
Diesel Consumption | Kg/h | 6.8 | 13.6 | 21 | 33.2 |
Natural Gas Consumption | Nm3/h | 7.7 | 15.2 | 26 | 37.5 |
Coal Gas Consumption | Nm3/h | 18.3 | 36.4 | 64.3 | 92.1 |
Power Voltage | V/Hz | 220/50 | |||
Steam Outlet | mm | DN25 | DN32 | DN40 | DN50 |
Water Inlet | mm | DN20 | DN20 | DN25 | DN25 |
Drain Outle | mm | DN25 | DN25 | DN40 | DN40 |
Chimney | mm | φ 133 | φ 159 | φ 200 | φ 200 |
Length | mm | 1180 | 1176 | 1420 | 1420 |
Width | mm | 1100 | 1100 | 1300 | 1300 |
Height | mm | 1755 | 2142 | 2305 | 2670 |
Weight | t | 0.76/0.78 | 0.92/0.96 | 1.40/1.54 | 1.68/2.30 |
5.
High quality accessory display
Some successful case
Packaging Detail:nude packing( according to customer's requirement) |
Delivery Detail:30 days after opening L/C or receive deposit |