High Efficiency Mud Cleaner on Oilfield Drilling

High Efficiency Mud Cleaner on Oilfield Drilling, 1.Capacity:200 m3/h, 2.Working Pressure:0.25 to 0.45MPa, 3.Motor:2x1.2KW - details see: https://www.machineto.com/high-efficiency-mud-cleaner-on-oilfield-drilling-10282757
Place of Origin:Shaanxi China (Mainland)Brand Name:TR Solid ControlModel Number:TRPZJ703Type:Oilfield Drilling
Usage:Solid ControlMaterial:Stainless SteelAfter Sale Service:Free for One YearApplication:HDD Solid Control
High Efficiency Mud Cleaner on Oilfield Drilling
contact supplier for High Efficiency Mud Cleaner on Oilfield Drilling


High Efficiency Mud Cleaner on Oilfield Drilling

High Efficiency Mud Cleaner on Oilfield Drillingis fixed drilling liquid solids control equipment consisting of desander,desilter and shale shaker. It integrates the performance of aforesaid three equipments, featuring large disposal capacity, rapid treatment speed, less energy consumption, occupying small space, etc. It receives the most welcome in the international drilling market.

Usage & Application Scope

ZJ300×2/100×12 Mud Cleaner is a key member of solid control equipments of drilling fluid that efficiently removes silt sized particles between 20~74 micron cut.It is comprised of one shale shaker,one desander and on desilter. It can efficiently handle the shale shake underflow, which can lead to high drilling speed with low cost.

The equipment has the feature of compact structure,small volume,convenient installation,and large handling capacity etc.

Mechanics & Working Principle

ZJ300×2/100×12 mud cleaner are complete with desander hydrocyclone, desliter hydrocyclone, linear motion shale shaker, mud trough, manifold, base and all necessary connections.

Under normal conditions,the desander assy is used to remove the sand solids during 40-74μm, the desilter assy is used to remove the pelitic solids during 20-40μm,and the shale shaker is used to recycle the liquidoid or barite.

High Efficiency Mud Cleaner on Oilfield Drilling
Packaging Detail:depend on the customer
Delivery Detail:30 days after pay the advance payment

Related Product for High Efficiency Mud Cleaner on Oilfield Drilling