High Efficiency FRP Cooling Tower XT-T40
Cooling Type:Cross Flow | Material:Metal | Place of Origin:Hebei China (Mainland) | Brand Name:XIANGTE |
Model Number:XT-T40 | Voltage:380V,50Hz | Power(W):1.1kw | Dimension(L*W*H):2*2*1.5m |
After-sales Service Provided:Engineers available to service machinery overseas | NAME:Water Cooling Tower XT-T40 | Weight:40T | High*Wide:215*165 MM |
Motor Power:1.1 KW |
1. Water Cooling Tower
Technical Parameters of Water Cooling Tower | |||
Cooling Tower/Ton | High*Wide(cm) | Motor Power(kw) | Flow per hour/Ton |
5T | 128*85 | 0.18 | 5 |
6T | 140*95 | 0.18 | 6 |
8T | 160*95 | 0.18 | 8 |
10T | 165*95 | 0.25 | 10 |
12T | 170*100 | 0.25 | 12 |
15T | 182*110 | 0.37 | 15 |
20T | 190*128 | 0.75 | 20 |
25T | 200*145 | 0.75 | 25 |
30T | 205*150 | 0.75 | 30 |
40T | 215*165 | 1.1 | 40 |
50T | 230*190 | 1.5 | 50 |
60T | 250*225 | 2.2 | 60 |
70T | 253*225 | 2.2 | 70 |
80T | 268*250 | 3 | 80 |
100T | 282*290 | 3 | 100 |
125T | 313*330 | 4 | 125 |
1500T | 335*330 | 4 | 150 |
2.intro:
Cooling towers are heat removal devices used to transfer process waste heat to the atmosphere.
Cooling towers may either use the evaporation of water to remove process heat and cool the working fluid to near the wet-bulb air temperature or in the case ofclosed circuit dry cooling towersrely solely on air to cool the working fluid to near the dry-bulb air temperature.
1.Hebei Xiangte Imp.& Exp. Co.,ltdis a exclusive sales agent of Hebei Xiangte Plastic Molding Machinery Co.,ltd. Established in 1999, Hebei Xiangte Plastic Molding Machinery Co.,ltd is specialized in theresearch, manufacturing, sales and service of various plastic molding machines,FRP water cooling tower,crusher machine,and so on.
2. With many yearsexperience of professional techniquesand sales network, we can provide customers with high-tech, high-precise and high -speed injection molding machines.
We have a high tech after-sale team which is responsible for the installation.
Packaging Detail:Seaworthy packing/plastic woven bag,Depend on your detailed requirement |
Delivery Detail:15-20 days after received your advance payment |