high cost performance nailed wood pallet machine
Condition:New | Place of Origin:Henan China (Mainland) | Brand Name:THOYU | Model Number:TYWP |
After-sales Service Provided:Engineers available to service machinery overseas | Brand:THOYU | name:nailed wood pallet machine | automation:high |
raw material:carbon steel | function:making nailed pallet | line or single machine:line | productivity:120-180 pallets per hour |
transport:by sea in FCL | pallet standard:EURO-Standard or USA-Standard | supply pallet block machine:yes |
high cost performance nailed wood pallet machine
1,nailed pallet;
2,Euro-Standard&USA-Standard;
3,high automation.
Introduction:
high cost performance wood pallet machine is used to make the nailed pallets which could be EURO-Standard or USA-Standard.
This line mainly needs 2 machines which are the host machine and vice machine. Host machine is used to make the final product - wood pallets. And the vice machine is used to cut the pallet block and make the block bars.
Features:
1, high automation;
2, could make pallets which comply to the EURO-Standard or USA-Standard;
3, the pallets are nailed and they are with big load.
It could make the pallet in this range:
Pallet width: 800-1200mm Pallet length: 800-1200mm
The productivity is 120-180 pallets per hour.
Detailed Pictures:
1, Control Panel
2, Turning
3, Corner Cutting
4, Stacking
Final Product:
Service for Customers
Pre-sale services:
Act as a good adviser and assistant of clients, enable them to get rich and generous returns on their investments.
a. Select equipment model;
b. Design and manufacture products according to clients' special requirement;
c. Train technical personnel for clients.
Services during the sale:
Respect clients, devote ourselves to improving the total value of the product.
a. Pre-check and accept products ahead of delivery;
b. Help clients to draft solving plans.
After-sale services:
Provide considerate services to minimize clients' worries.
a. Assist clients to prepare construction scheme;
b. Install and debug the equipment;
c. Train the first-line operators;
d. Examine the equipment;
e. Take initiative to eliminate the troubles rapidly;
f. Provide perfect service;
g. Provide technical exchanging.
Packing Condition:
1.Machines are wrapped in plastic bags first before being convolved with rope.
2.Then the machines are putted in strong iron sheet case/wooden case, lined with metal wire if necessary.
Delivery time is within 20 work days after getting payment.
Payment terms:
T/T, western union, money gram, escrow, L/C.
Any more interest, plz contact with me at any time when you feel free:
Packaging Detail:FCL |
Delivery Detail:within 20 work days after getting payment |