Gypsum powder production line technology
Place of Origin:Maharashtra India | Brand Name:Vinayak | Model Number:V100-V2000 |
1. Brief Introduction of Gypsum Powder
The natural gypsum powder includes anhydrous gypsum and CaS04.2H2O, if you want to commercialize the gypsum powder, you should adopt the CaS04.2H2O,
after removing part of water by heating, it will become CaS04.1/2 H20. CaS04.1/2 H20 is the final product which you can use it to produce gypsum board other
gypsum product. After calcining, CaSO4.1/2H2O is widely used in paper faced gypsum board and gypsum block and painting gypsum powder and model.
Natural gypsum generally includes dehydrate gypsum and anhydrous gypsum. In order to get the valuable materials, generally, we get semi-hydrated gypsum
through heating the dehydrate gypsum.
The calcined semi-hydrated gypsum can widely be used for plasterboard, decoration board, gypsum block, stucco gypsum, and molding gypsum etc
Content of CaSO4·2H2O in gypsum mine > 80%.
Gypsum board production lineadopts the German GRENZEBACH BSH and GYPTECH company, Lafarge,
the United States INC companies and domestic well-known enterprises Kitashinchi Group, Taihe Group
advanced technology. We adopts the horizontal flow, vertical airflow heat exchanger heating system, the raw
material feeding system and edge cutting and edge sealing and edge grinding and recycling system and stacking
system are all controlled by computer. All the whole line is full automation.
Gypsum powder production lineadopts boiling furnace, high-voltage electrostatic dust removing and other
advanced equipment, it is energy-saving and environmental protection.
Technology introduction of boiling furnace
With the development and progress of gypsum industry, the need of gypsum powder is growing, also with the quality of gypsum powder. During the whole
procedure, the drying and dehydration are the key link, and it is also the difficult part. According to such a condition, after many years researching and exploring,
we have developed a new generation dehydration device which are suitable for all kinds of gypsum production demand boiling furnace
Principle of working
The main principle of drying system: the boiling furnace body is consist of delicate and intensive cooling coil pipe. Put the heat conductive oil in the pipe, and
release the heat into the inside of furnace. There is a Roots blower under the bottom of boiling furnace, and blow the air into the furnace, until blowing the powder
into boiling status. Under a certain temperature, the dried and dehydrated powder become light, and flow to the outlet automatically. The quality of this kind of
gypsum powder is stable, because the equipment adopts dried electrostatic dust remover, so the dust-removing efficiency is above 95%.
Structure simple and durable
Because we realize fluidization, the furnace does not need moving component, and the structure of the furnace becomes simple. Not only it is easy to manufacture,
but also we do not need maintenance after put into operation. Because we use low-temperature source, so the furnace does not have any risk of being burnt in any
condition, also the equipment will have a long life.
Compact equipment, low area coverage
The boiling equipment is vertical-arranged equipment, and the dust remover on the top of the furnace, make a complete body with the furnace. So the equipment is
compact and low area coverage.
Low energy consumption
The boiling furnace with low heat and electricity consumption. In the part of energy: Most of the heat is used to dehydration and decomposition, and the rest of
small part is used to heat the air from the bottom of the furnace.
The heat efficiency of the furnace is above 95%. Of course the boiling furnace uses the second heat source, and final heat efficiency is amounting to the furnace
efficiency multiply the boiler efficiency. But the steam boiler and the hot oil boiler are all mature hot equipment with high heat efficiency. The steam boiler can
reach to 60%-70%, hot oil boiler can reach to 70%-80%. (our company adopts heat conductive oil furnace), so the general heat efficiency is high. Use steam, it can
reach to 57%-67% .Use hot oil, it can reach 67%-77%.
In the parts of electricity: the boiling furnace does not need move, also without mixer, it realize the fluidization by the steam of gypsum dehydration, because blow
limit air into the bottom of the furnace, so the power of the blower is low, and the boiling furnace have less electricity consumption than the traditional calciner.
Good quality and stable performance
Because adopt low-temperature heat source, so the gypsum is not easy to be burnt, as long as the temperature is controlled properly, there will not have CaSO4
2H2O in the finished product, and the anhydrous gypsum is within 5%, and the rest are CaSO4 1/2H2O.
In order to reach the above requirement, our company have researched and developed a whole set of boiling furnace processing technology, the main material is
good-quality steel. For example, heat conductive oil pipe adopts seamless steel pipe (GB3087-82). Steel plate adopts carbon steel and low-alloy steel (GB713-86);
Frame steel adopts international product .Furthermore, in the work of welding, all the workers have work certificate, after welding, the coil pipe will have a water
pressure test, just in case of leakage of heat conductive oil. The product is qualified if there is no leakage under the water pressure of 1.0~1.5Mpa for 24 hours.
Packaging Detail:In 40 FT HQ Container |
Delivery Detail:1 month |