gypsum powder production line/gypsum powder machine/gypsum powder plant

gypsum powder production line/gypsum powder machine/gypsum powder plant, 1.Low Consumption, 2.40years Experience - details see: https://www.machineto.com/gypsum-powder-production-line-gypsum-powder-machine-gypsum-powder-plant-10086671
Condition:NewApplication:Building Construction,builidng and decoration and wall pastingAutomatic Grade:Automatic,Automatic,Full automaticProduction Capacity:High,99.8%
Place of Origin:Hebei China (Mainland)Brand Name:LVJOEModel Number:LVJ2620Voltage:380V/50HZ
Power(W):300KWDimension(L*W*H):50*30MWeight:270 tonsFeatures:New,Advacend technology
Certification:ISO+CEWarranty:1 YearAfter-sales Service Provided:Engineers available to service machinery overseasAnnual capacity:15000 to 500000 tons
Style:CalcinerFuel:Coal, natural gas, heavy oil or light oilExperience:13 yearsExport market:Africa, Middle east, Asia, Russia etc
gypsum powder production line/gypsum powder machine/gypsum powder plant
contact supplier for gypsum powder production line/gypsum powder machine/gypsum powder plant


Hebei Lvjoe Machinery Manufacturing Co.,Ltd ,had been 15 years experience in designing and manufacturining various of industrial machineries.such as:

Gyosum Board Production Line,

Plaster of Paris Gyopsum Powder(chemical ,natural) Production Line,

Gyopsum Block Production Line,

Gypsum Board Lamination Production line.

Accumulating richly experience in equipments design and manufacture,installation.

1.The brief introduction of the production.

The crusher breaks the big sized gypsum ore into small ones with 25mm in diameter. After storing and

conveying, they are taken into the mill for grinding. Then, the power concentrator carries the gypsum

powders which match to the needed fineness to the calciner for calcining. Others are back to the mill

until it is qualified. In the end, after calcining, the qualified gypsum powder are sent to clinker container

for storing, or are sent to the manufacturing workshops for use.

2. The processing craft

3.Manufacturing Pictures :

4.workers distribution on site

The Crusher System: 2 person/ day (including the forklift driver

The Mill System: 1 person/ eight hours (that is 3 people/ day)

The Calcine System: 1 person/ eight hours (that is 3 people/ day)

The Heat Supply System: 2 people/eight hours(that is 6 people/day)

Electrical Engineering: 1 person/ day

Machinery Maintenance: 1 person/ day

In total: 16 person

5.Quality Standard

The quality of building gypsum is in accordance with Chinese National Standard “Gypsum Powder” (GB9776-2000).

6.Equipments and technical parameters

No.NameSpecificationQuantity (set)FunctionNote
1Feeding hoper5m³1

Batching system

2Additive agent hoper1m³1
3Weighing beltDEL05251
4Disk feederΦ5001
5Magnetic

iron remover

1
6Belt conveyorDJ-5001
7Hot air furnace3 million

kilocalorie

1

Drying system

8Air blower1
9Rotary dryerΦ1.8m x 181
10Screw conveyorLS3151

raw

material conveyor

11Bucket elevatorTH3151
12Buffer silo1
13screw

conveyor

Φ3002
14Calciner2m x 1.8m1

Calcined system

15Electric precipitatorΦ600 x 41
16Buffer silo1.5 m³1
17Ball grinding millΦ1.5 x 4.5m1Grind, modify
18Bucket elevatorTH3151
19Finished

product warehouse

2
20Thermal oil boiler &

auxiliary equipment

3 million

kilocalorie

1Supply heat source

7.Advantage:

1.crushed process flow introduction

crusher breaks up large sized gypsum ore to small granule less 25mm. 2.boiling furnace

the equipment has over 95% dust collection efficiency and eliminate the dust polltion and sustainable structure

Because of the fluidization material, funace doesn't need rotatable component

damaged by over heating and has longer operating life.

2.compact design and less space requirement

With vertical arrangement, the dust catcher on the top of the furnace body is integrated with the boiling furnace compactly. the system not only less space but also avoids condensation of the dust catcher.

8.Our service

1) The machineguarantee 5 yearsexcept the easy worn parts such as bearings, electric buttons.

2) machine delivery time:2 to 4months after the deposit.

3) payment terms: TT or LC

4) machine installation and commission:2 to 3months when the buyer prepare the installation and commission conditions.

5) we offer engineers train the buyers' worker to operate the machine and after you master the machine then pay us the installation and commission payment.

6) In order to guarantee the machine running, each year we will send engineer to check and development the technology with the buyer.

7) If the buyer can not run the machine well then we will send the production engineers to help the buyer to run the machine, and we can cooperate for long terms.

9,For Price And Support:

I am interested ingypsum powder production line,the raw material is ,capacity is tons an hour,send quotation to (e-mail),Name: Phone:

Country: Message Submit

My pleasure to help you in your plaster of paris gypsum powder machine investment busines.

Best Regards

bella

Hebei LVJOE Machinery Manufacturing Co.,Ltd

Tel:086-85965522/85965533

Fax:086-85965522

Skype:angelmay2011

Mobile NO:086-18731153620

gypsum powder production line/gypsum powder machine/gypsum powder plant
Packaging Detail:Standard package for exportation
Delivery Detail:2 months for MOQ

Related Product for gypsum powder production line/gypsum powder machine/gypsum powder plant