gypsum powder production line
Place of Origin:Hebei China (Mainland) | Brand Name:fc |
gypsum powder production line
The gypsum powder production line of which the material is natural gypsum, are equipped with many advanced technological equipment in domestic and foreign such as material averaging device, double-grade crushing system, plate type conveyor, vertical mill, Ramon mill, gypsum boiling kiln, cooling machine and waste heat recycling system, ect. The boiling kiln is widely used in our nation with the advantages of small, simple, great output, small occupied area, easy control, perfect gypsum microstructure, stable physical properties and low running cost. It has been sold to Thailand, Uzbekistan, Columbia and Mexico along with our production line.
1. Quality Standard
The quality of building gypsum is in accordance with Chinese National Standard “Gypsum Powder” (GB9776-2000), and should meet the following requirements:
No. | Item | unit | Indices |
1 | Initial time | min | ≥6 |
2 | Final time | min | ≤13 |
3 | Bending strength of 2 hours | MPa | ≥2.0 |
4 | Content of CaSO4·2H2O | % | ≤5% |
5 | Content of CaSO4·1/2H2O | % | ≥75% |
6 | Content of CaSO4III | % | ≤5% |
2. Annual capacity:
40,000 t - 500,000 t
3. Production process:
Dosing section—forming section—cutting and drying section—edge trimming and stacking section
4. Fuel variety:
Coal, natural gas, diesel oil, heavy oil, ect.
5. Advantages:
We can offer a basket of services of design, producing, installation, commissioning and training, as well as turnkey project for customers.
With a strong design team as the basis, we can supply equipments and production line with different configuration which are tailored to customers’ requirements. We guarantee whole-life service for our equipments.
We have a well-equipped laboratory which can assay raw material for our customers, and according to the test results, we can realize the finally debugging which reduced the cost for preliminary investigation and commissioning.
Packaging Detail:wooden boxes and containers |
Delivery Detail:50 days |