Gypsum Board Production Line( CIQ, SGS Checking)
1.High Quality Gypsum Board Production Line, 2.2 to 50 million sq.m/year, 3.Advanced design concept, 4.Turnkey project, 5.CE ISO - details see: https://www.machineto.com/gypsum-board-production-line-ciq-sgs-checking-10079444
Place of Origin:Hebei China (Mainland) | Brand Name:RUBIN | Model Number:MSK-590 | After-sales Service Provided:Engineers available to service machinery overseas |
The capacity:2 to 50 million square meters per year | Type:Hot air style and hot oil style | Degree of automation:Full automatic | Fuel:Coal, Natural gas, heavy oil, light oil |
Guarantee:5 years and forever after sales service | Certificate:CE, ISO | Checking:CIQ, SGS checking | Experience:14 years |
Export experience:10 years | Exported countries:Iran, Pakistan, Uzbekistan, Indian etc |
Gypsum Board Production Line( CIQ, SGS Checking)
Machine introduction:
Capacity |
|
Type |
|
Degree of automation |
|
Fuel |
|
Consists of 4 parts of gypsum board production line |
|
Raw materials |
|
Gypsum board product specification |
|
Material balance calculation per sq.m |
|
Gypsum board production line consists of 12 parts:
Mainly system | Systematicintroduction |
Paper supply part |
|
Slurry part |
|
Foaming part |
|
Conveying part |
|
Cutting part |
|
Transferring part |
|
Dryer part |
|
Finished products converying part |
|
Fast outlet part |
|
Sizing part |
|
Stacking part |
|
Control center part |
|
Manufacturing:
The machine delivery:
Detailed packaging for the gypsum board production line :
1. | All the electrical parts and easily damaged parts will load in wooden case,such as electrical cabinets,motors,PLC,switch,touch screen etc. |
2. | Mechanical parts will in bundle,such as:all the rollers.Others will in bulk,such as heat preservation doors,steel frame etc. |
3. | If you have any requirements about the packaging,we will do it according to that. |
The gypusm board manufacturing by the prodution line:
The good relationship customers:
We are on the job site:
The machine and service:
Guarantee | 5 years |
Installation and commissioning | Within 2 to 4 months when the buyer prepare the installation and commissioning conditions. |
Engineers services | We offer engineers train the buyers' worker to operate the machine and after you masterthe machine then pay us the installation and commission payment. |
In order to guarantee the machine running, each year we will send engineer to check and development the technology with the buyer. | |
If the buyer can not run the machine well then we will send the production engineers to help the buyer to run the machine, and we can cooperate for long time. |
This is Rubin Industry and hope we can work together for better future!
Contact person-rubin
Mob No------008613833188732
Packaging Detail:Gypsum Board Production Line( CIQ, SGS Checking):1) Standards export packing which fit for long time delivery 2) Seaworthy packing.Use 20GP,40GP and 40HQ containers and frame containers. |
Delivery Detail:Gypsum Board Production Line:Within 3-6 months. |