GRP FRP pipe making machine
DN300-4000mmGRP FRP pipe making machines - details see: https://www.machineto.com/grp-frp-pipe-making-machine-10081522
Condition:New | Type:Pipe Production Line | Pipe Material:Composite | Application:Drain Pipe |
Place of Origin:China (Mainland) | Brand Name:Vidatech | Model Number:VDFW | Certification:CE |
Warranty:360DAYS | After-sales Service Provided:Engineers available to service machinery overseas | Materials:FRP GRP |
DN300-4000mmGRP FRP pipe making machine
This production line consists of complete equipments of GRP MP (Glassfiber Reinforced Plastics Motar Pipe) pipe production, from pipe liner making and curing, structural layer making and curing, finishing and grooving and pipe extraction, with the following available pipe diameter range: DN300 up to DN3000mm.
Transmission system gear & rack
Sand filling method: premixing or laminating
Filament winding machine
Curing machine
Demoulding machine
Calibration machine
Corollary equipment Hydrotesting machine þ Optional Pipe mould þ
Laboratory instrument for testing the pipe þ Optional
1.Liner Making Machine for Chemical resistant liner making,which apply the rotating mandrel with fiberglass surface mat, resin, stitched mat etc.
2.Filament Winding Machine for the structure layer making of the pipe,which apply fiberglass roving , resin and sands
3.Curing Station Curing of the Pipe with the mandrel
4.Calibration Machine grinding the pipe jointing groove with the mandrel
6.Demoulding Machine Extract the pipe from the mandrel
7.Hydrotesting Machine Apply the pipe on the hydrotesting machine,inject water to the pipe up to the requied pressure.
8.Labortory equipment:Testing of the FRP pipe's hardness,thickness etc.
1. Easy and convenient operation ,and computer control system.
2. Keep low consumption of the raw materials.
3. Experienced pipe produciton technology assitant.
The production process of the GRP pipe is based on the filament winding technique and complies with,ASTM D3754, ASTM 3262, BS 5480:1990,ASTM D3517, AWWA C950, AWWA Manual M45.
Packaging Detail:iin bulk |
Delivery Detail:90 days |